某水电站地下厂房典型渗漏原因分析及整治 被引量:3

Cause Analysis and Treatment of Typical Leakage in Underground Powerhouse of a Hydropower Station
在线阅读 下载PDF
导出
摘要 水电站地下厂房是水电站的重要组成部分,随着水电站运行管理的不断深入发展,厂房渗漏水的问题对厂房的使用功能、使用寿命以及相关设备的影响逐渐凸显。结合某水电站地下厂房特点,着重分析厂房发生渗漏水的原因,并针对不同类型的渗漏所采取的处理措施法进行总结。根据工程所处的工程水文地质、建筑结构、渗水发生的部位及随气候变化特点进行综合分析,采取“化学灌浆、引、排、堵”相结合的原则,进行了综合处理,从而有效控制了地下厂房系统的渗漏问题。 Underground powerhouse is an important part of hydropower station.With the continuous in-depth development of operation and management of hydropower plant,the impact of leakage on the service function,service life and related equipment of powerhouse is gradually highlighted.Based on the characteristics of underground powerhouse of a hydropower station,this paper mainly analyses the causes of water leakage in powerhouse and summarizes the treatment measures taken for different types of leakage.According to the engineering hydrogeology,building structure,location of seepage and the characteristics of climate change,comprehensive analysis is carried out,and the principle of combining chemical grouting,diversion,drainage and blockage is adopted to carry out comprehensive treatment,thus effectively controlling the seepage problem of underground powerhouse system.
作者 宋志诚 SONG Zhi-cheng(Guoneng Daduhe Pubugou Hydropower General Plant,Hanyuan 625304,China)
出处 《云南水力发电》 2022年第1期51-53,共3页 Yunnan Water Power
关键词 地下厂房 渗漏水 原因分析 处理措施 underground powerhouse leakage cause analysis treatment
  • 相关文献

参考文献11

二级参考文献12

共引文献21

同被引文献24

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部