摘要
文章以辽宁省绥中县李金水库除险加固工程为例,通过模型试验的方式探讨了溢洪道消力池优化设计问题。根据试验结果,采用消力池加宽、加深+增设尾墩方案可以获得最佳消能效果,推荐在工程设计中使用。
Taking the reinforcement project of Lijin Reservoir in Suizhong County of Liaoning Province as an example, this paper discusses the optimization design of spillway stilling pool through model test. According to the test results, the scheme of widening and deepening of stilling pool and adding tail pier can obtain the best energy dissipation effect, which is recommended to be used in engineering design.
出处
《东北水利水电》
2022年第9期25-27,71,共4页
Water Resources & Hydropower of Northeast China
关键词
台阶溢洪道
消力池
体型优化
李金水库
模型试验
Lijin Reservoir
step spillway
stilling pool
shape optimization
model test