文章以国道G104线宁德蕉城区城南福洋至飞鸾孝岐头段改扩建工程为依托,在满足现行设计规范条件下,不盲目追求“高大上”的建设标准,因地制宜,调查分析客观的建设条件和制约因素,对升级改造方案进行初步探讨,以实现提升交通功能、服务地方经济发展、方便沿线居民交通出行、省造价、易施工的改造目标。
Based on the reconstruction and expansion project of the first section from Chengnan Fuyang to Feiluan Xiaoqi in Jiaocheng District, Ningde City on National Highway line G104, it does not blindly pursue high-end construction standards under the condition of meeting the current design specifications in this paper. According to local conditions,the objective construction conditions and constraints are investigated and analyzed to preliminarily discuss and study the upgrading and reconstruction plan in order to realize the reconstruction goals of improving traffic function, serving local economic development, facilitating the transportation for residents along the line, saving cost and making construction easier.
作者
汪胜义
Wang Shengyi(China Railway Major Bridge Reconnaissance&Design Institute Co.,Ltd.,Wuhan,Hubei 430050)
出处
《工程技术研究》
2022年第13期191-193,共3页
Engineering and Technological Research
关键词
临海山区公路
交通需求
升级改造
highways in Linhai mountainous area
traffic demand
upgrading