期刊文献+

跨既有线铁路连续梁桥传送带输送混凝土浇筑悬臂段施工工法 被引量:6

CONSTRUCTION METHOD OF GROUTING CANTILEVER SEGMENT BY CONTINUOUS GIRDER BRIDGE CONVEYOR BELT CONVEYING CONCRETE UPPER-SPANNING EXISTING RAILWAY
在线阅读 下载PDF
导出
摘要 西安地铁5号线跨越新西宝高速公路的铁路桥梁,采用挂篮施工的连续刚构。根据现场实际情况,悬臂段浇筑以往采用2台天泵平衡浇筑或采用地泵配三通泵管输送混凝土的方式浇筑,而本工程采用天泵配合传送带输送混凝土浇筑悬臂段的施工方法,取得了良好的经济效益和社会效益。 The railway bridge of Xi’an Metro Line 5 upper-spanning the New Xi’an-Baoji Expressway adopts the continuous rigid frame with cradle construction. Grouting cantilever segment is operated with two pump trucks or ground pump equipped with tri-branch pump pipes based on the actual situation on site in the past, while, the new construction method of combining pump trucks with conveyor belts to convey concrete and grout cantilever segment is used in this project, achieving good economic and social benefits.
作者 孙少锋 SUN Shao-feng(The 2nd Engineering Co.,Ltd of China Railway 17 Bureau Group Corporation,710000,Xi'an,China)
出处 《建筑技术》 2023年第1期110-113,共4页 Architecture Technology
关键词 连续梁桥 挂篮悬臂法施工 传送带 混凝土 continuous girder bridge hanging basket cantilever construction conveyor belt concrete
  • 相关文献

参考文献5

二级参考文献34

共引文献15

同被引文献39

引证文献6

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部