龙滩水电站调速器开机时间异常分析与处理

Analysis and Treatment of Abnormal Startup Time of Governor of Longtan Hydropower Station
在线阅读 下载PDF
导出
摘要 水轮机调速器是水轮发电机组的主要控制设备,调速器性能决定了机组调节性能,同时还关系到水轮发电机组的开关机时间,是影响机组安全稳定运行的重要设备。通过查找水轮机调速器电气、机械部位存在的异常,快速分析和处理水轮机调速器存在的故障,为水轮机调速器故障处理提供实践案例,提高水轮机调速器故障解决能力,改善调速器综合性能,保证了水轮机发电机组的安全稳定运行。 The turbine governor is the main control equipment of the hydro-generator set.The performance of the governor determines the adjustment performance of the unit,and is also related to the on-off time of the hydro-generator unit.It is an important device that affects the safe and stable operation of the unit.By looking for abnormalities in the electrical and mechanical parts of the turbine governor,quickly analyze and deal with the faults of the turbine governor,provide practical cases for the troubleshooting of the turbine governor,improve the troubleshooting ability of the turbine governor,and improve the governor.The comprehensive performance ensures the safe and stable operation of the hydro turbine generator set.
作者 蒙小雷 Meng Xiao-lei
出处 《今日自动化》 2022年第12期4-6,共3页 Automation Today
关键词 水轮机调速器 开机时间 主配压阀 异常处理 turbine governor startup time main pressure distribution valve exception handling
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部