马堡煤业大采高工作面预掘回撤通道掩护式支架支护探讨 被引量:3

Discussion on Covered Bracket Support for Pre-excavation and Retraction Channel of Large Mining Height Working Face in Mapao Coal Industry
在线阅读 下载PDF
导出
摘要 为提升综采工作面液压支架的回撤速度和效率,保障煤矿的生产效率和能力,以15202综采工作面为研究对象在对其地质条件分析的基础上,采用KJ-327液压支架压力监测系统对工作面的矿压显现规律进行实测,为后续支护提供数据支撑。采用临时和永久支护相结合的方式对15202回撤通道进行有效支护,保证液压支架能够高效、顺利回撤。 In order to improve the retraction speed and efficiency of the hydraulic brackets at the comprehensive mining face,and to guarantee the productivity and capacity of the coal mine,the 15202 comprehensive mining face is used as an example on the basis of the analysis of its geological conditions;the KJ-327 hydraulic bracket pressure monitoring system is used to measure the mine pressure manifestation pattern at the working face,and to provide data support for the subsequent support.Finally,a combination of temporary and permanent support was used to effectively support the 15202 retreat channel to ensure that the hydraulic support could be retracted efficiently and smoothly.
作者 常书清 Chang Shuqing(Shanxi Mabao Coal Industry Co.,Ltd.,Changzhi Shanxi 046399)
出处 《机械管理开发》 2023年第3期287-289,共3页 Mechanical Management and Development
关键词 掩护式液压支架 回撤通道 压力监测系统 矿压显现 联合支护 cover hydraulic support retraction channel pressure monitoring system mine pressure manifestation combined cable support
  • 相关文献

参考文献5

二级参考文献57

共引文献79

同被引文献14

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部