高风险长大隧道贯通式平导施工动态管理方法优化

Optimization of Dynamic Management Method for Through Parallel Drift Construction in High-risk Long Tunnel
在线阅读 下载PDF
导出
摘要 在西南山区铁路长大隧道施工中,贯通式平导辅助正洞施工作为常见的施工方案,因平导施工牵引正洞施工,平导施工进度成为影响隧道整体工期的关键。为加快平导施工进度,通过分析贯通式平导施工面临的挑战,从技术管理、进度管理、安全质量管理和成本管理进行了经验总结,为西南山区类似铁路隧道施工提供参考。 In the construction of long railway tunnels in the mountainous area in southwest China,it is a common construction method to use the through parallel drift to assist the construction of the main tunnel.Since the construction of parallel drift leads the construction of the main tunnel,the construction progress of parallel drift has become the key factor affecting the overall construction period of the tunnel.In order to accelerate parallel drift construction progress,the paper analyzes the difficulties encountered during parallel drift construction,summarizes the experience in terms of technical management,schedule management,safety and quality management,and cost management,and serves as a reference for similar railway tunnel construction in southwest China’s mountainous area.
作者 伍林 解亚龙 聂现会 WU Lin;XIE Yalong;NIE Xianhui(Engineering Management Center,China State Railway Group Co.,Ltd.,Beijing 100844,China;Institute of Computing Technology,China Academy of Railway Sciences Corporation Limited,Beijing 100081,China;Beijing Jingwei Information Technology Co.,Ltd.,Beijing 100081,China)
出处 《铁路技术创新》 2023年第1期60-64,共5页 Railway Technical Innovation
关键词 长大隧道 高风险隧道 贯通式平导施工 施工组织 long tunnel high-risk tunnel through parallel drift construction construction organization
  • 相关文献

参考文献9

二级参考文献56

共引文献36

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部