摘要 【目的】为了分析地铁开挖对地面沉降的影响。【方法】本研究以郑州市轨道交通7号线一期工程土建施工02工区黄河迎宾馆站至英才街站区间左线盾构区间为研究对象,建立了FLAC3D计算模型,研究了模型隧道开挖后形成的位移曲线。【结果】得到隧道开挖掘进地表的沉降规律,与实际工况基本吻合。【结论】说明数值模拟对盾构施工前期研究具有一定的参考价值。 [Purposes]In order to analyze the influence of subway excavation on land subsidence.[Meth⁃ods]In this study,the left line shield section between Huanghe Yingbin Hotel Station and Yingcai Street Station in the 02 working area of the civil construction of the first phase of Zhengzhou Rail Transit Line 7 was taken as the research object.The FLAC^(3D)calculation model was established to study the displace⁃ment curve formed after the excavation of the model tunnel.[Findings]The settlement law of tunnel ex⁃cavation surface was obtained,which was basically consistent with the actual working condition.[Con⁃clusions]The numerical simulation has certain reference value for the preliminary study of shield con⁃struction.
作者 杨锦涛 YANG Jintao(College of Geosciences and Engineering,North China University of Water Resources and Electric Power,Zhengzhou 450046,China)
出处 《河南科技》 2023年第8期61-64,共4页 Henan Science and Technology
关键词 FLAC3D 隧道开挖 沉降分析 地层参数 FLAC^(3D) tunnel excavation settlement analysis formation parameters
  • 相关文献

参考文献10

二级参考文献109

共引文献50

同被引文献19

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部