以合肥中环城E3地库A座办公楼工程为背景,为解决屋面超高临空幕墙安装难题,通过对超高临空幕墙安装进行施工方法的总结及创新,重点阐述新型吊篮结构的设计及安装,工程实践证明新型无配重外挂吊篮在超高临空幕墙安装中施工的可行性,整体上提高了施工效率,保证了作业安全,降低了施工成本,可为同类型工程施工提供参考。
Taking the office building project of Building A in the E3 basement of Hefei Central City as the background,in order to solve the problem of installing super high aerial curtain walls on the roof,the construction methods for the installation of super high aerial curtain walls are summarized and innovated,and the design and installation of a new type of hanging basket structure is emphasized.The engineering practice proves that the using a new type of non-counterweight hanging basket in the installation of super high aerial curtain walls is feasible,the overall construction efficiency is improved,the work safety is ensured,and the construction costs are reduced.It can provide reference for the construction of similar projects.
作者
程龙树
陈龙
方宇
熊科军
CHENG Longshu;CHEN Long;FANG Yu;XIONG Kejun(China Construction 4th Engineering Bureau 6th Co.,Ltd.,Hefei 230011,Anhui,China)
出处
《建筑施工》
2023年第6期1135-1138,共4页
Building Construction
关键词
超高层建筑
屋面
临空幕墙
无配重
外挂吊篮
super high-rise building
roof
aerial curtain wall
non-counterweight