露天矿台阶并段带来的经济效益分析 被引量:1

Economic benefit analysis of step merging section in open-pit mine
在线阅读 下载PDF
导出
摘要 针对抚顺东露天矿现场生产局部采用并段方式,由此增加台阶高度的实际情况;分析了并段后剥岩量的变化、对下部富矿采区露出的影响、台阶高度变化后对露天矿剥岩费用的影响关系。结果表明:采用台阶并段的方法来增加台阶高度可以减少剥岩量,并加快下部采区露出,增加经济效益。 Aiming at the actual situation of Fushun East Open-pit Mine,locally using the method of merging sections to increase the step height,the article analyzes the change of rock stripping amount after merging sections,the influence on the exposure of the lower rich ore mining area,and the influence relationship between the change of step height and the rock stripping cost of open-pit mine.The results show that increasing the step height by bench merging can reduce the amount of rock stripping,speed up the exposure of the lower mining area,and increase economic benefits.
作者 梁嘉伟 LIANG Jiawei(East Open-pit Mine,Fushun Mining Group Co.,Ltd.,Fushun 113000,China)
出处 《露天采矿技术》 CAS 2023年第4期111-113,共3页 Opencast Mining Technology
关键词 单斗铁道工艺 台阶高度 并段 剥岩量 经济效益 single bucket railway technology step height merging section rock stripping amount economic benefit
  • 相关文献

参考文献7

二级参考文献9

  • 1王儒军,吴学民.预应力锚索在边坡加固中的效益分析[J].露天采矿技术,2004,19(4):20-21. 被引量:6
  • 2蔡美峰.岩石力学与工程[M].北京:科学出版社,2008.
  • 3周昌寿.露天矿边坡稳定[M].徐州:中国矿业大学出版社,1990..
  • 4.[A]..第一届国际爆破论文集[C].,1993,8..
  • 5朱忠.岩石爆破新技术,1986,(04).
  • 6刘永学.矿山岩体力学基础[M].,..
  • 7Lechner E M. Contribution to the optimization of Bench Heights in Hard Rock Open-pits. Berg-and Huttenmechanische Monatshefte V 127 n 8Aug 1982:279-284.
  • 8张世雄.同体矿物资源开发工程[M].武汉:武汉理工大学出版社.2005.
  • 9蒋斌松,蔡美峰,都浩.平面滑动边坡稳定性的解析计算[J].岩石力学与工程学报,2004,23(1):91-94. 被引量:47