摘要
以韶关某港区综合大楼工程为例,根据施工现场溶洞地质条件,研究溶洞处理技术,提出不同条件下的溶洞处理方法,研究讨论了溶洞处理的施工工艺,总结溶洞处理过程中的注意事项,妥善处理施工现场的不良地质,以便桩基建筑工程的正常施工和建成后的安全使用。
Taking a port complex project in Shaoguan as an example,according to the geological conditions ofkarst caves at the construction site,the treatment technology of karst caves is studied,the treatment methods of karst caves under different conditions are proposed,the construction technology of karst caves is studied and discussed,and the precautions in the treatment process of karst caves are summarized to properly deal with the bad geology at the construction site,so as to facilitate the normal construction of pile construction project and the safe use aftercompletion.
作者
陈亨利
CHEN Heng-li(Guangzhou Port Engineering Design Institute Co.Ltd.,Guangzhou 510000,China)
出处
《工程建设与设计》
2023年第24期34-36,共3页
Construction & Design for Engineering
关键词
建筑工程
溶洞处理
钻孔灌注桩
施工工艺
construction engineering
cave treatment
bored pile
construction technology