期刊文献+

上海轨道交通4号线某站点基坑降水设计研究

Study on Dewatering Design of Foundation Pit at a Station of Shanghai Metro Line 4
在线阅读 下载PDF
导出
摘要 结合上海轨道交通4号线某站点基坑降水工程实例,分析工程地质条件和水文地质条件,通过对基坑底板稳定性进行分析,对基坑涌水量、单井涌水量进行计算,合理确定降压井数量以及降压井深度,结合以上各步骤完成工程降水方案设计。 This paper combined with the foundation pit dewatering project of a station of Shanghai Rail Transit Line 4,analyzed the engineering geological conditions and hydrogeological conditions,analyzed the stability of foundation pit floor,calculated the water inflow of foundation pit and the water inflow of a single well,reasonably determined the number of depressurized Wells and the depth of depressurized Wells,and completed the engineering dewatering scheme design based on the above steps.
作者 吴延淮 WU Yan-huai(Geological Team 321,Anhui Geological and Mineral Exploration Bureau,Tongling 244031,China)
出处 《工程建设与设计》 2024年第11期37-41,共5页 Construction & Design for Engineering
关键词 基坑稳定性分析 涌水量计算 降水井数量 深度 foundation pit stability analysis water inflow calculation dewatering well quantity depth
  • 相关文献

参考文献4

二级参考文献21

共引文献43

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部