摘要
针对克州乌恰县的100万kW光伏项目,详细讨论了施工过程中的质量控制策略。从施工前准备阶段、导线架设施工阶段和施工后验收阶段,分别就施工材料检查、施工设备检查、方案拟定、导线架设顺序控制、绝缘子质量要求、特殊地段处理、施工过程安全管控、测试和验收以及施工资料整理等方面进行了阐述。
For the 1 million kW photovoltaic project in Wuqia County,Zijin Longjingke Prefecture,the quality control strategy in the construction process was discussed in detail.This paper expounds the construction material inspection,construction equipment inspection,scheme formulation,wire erection sequence control,insulator quality requirements,special lot treatment,construction process safety control,testing and acceptance,and construction data arrangement from three stages:pre-construction preparation stage,wire erection construction stage and post-construction acceptance stage.
作者
杨小川
YANG Xiao-chuan(The Fourth Engineering Co.Ltd.ofCCCC First Highway Engineering Co.Ltd.,Nanning 530012,China)
出处
《工程建设与设计》
2024年第20期214-216,共3页
Construction & Design for Engineering
关键词
外输电线路工程
导线架设
质量控制
施工安全
external power supply projects
conductor installation
quality control
construction safety