期刊文献+

综采工作面超前应力分布及支护技术研究

Advanced Stress Distribution and Support Technology of Fully Mechanized Mining Face
在线阅读 下载PDF
导出
摘要 为了解决青磁窑煤矿8806工作面巷道围岩变形量大的问题,采用FLAC^(3D)软件模拟了工作面超前支承压力的分布情况,当工作面推进165~170 m,且距巷道5~15 m时,巷道受超前支承压力影响大,围岩较为破碎。因此,根据工作面超前支承压力的规律,提出了在巷道左帮、顶板、右帮分别布置5、7、5根锚杆,顶板布置2根锚索,并进行注浆加固。现场实践表明,优化后的支护方案能够保证工作面的安全回采。 In order to solve the problem of large deformation of the surrounding rock in the 8806 working face of Qingciyao Coal Mine,FLAC^(3D) software was used to simulate the distribution of advanced support pressure in the working face.When the working face advanced 165-170 m and was 5-15 m away from the roadway,the roadway was greatly affected by the advanced support pressure,and the surrounding rock was relatively broken.Therefore,based on the law of advanced support pressure in the working face,it was proposed to arrange 5,7,and 5 anchor rods on the left,top,and right sides of the roadway,respectively,and to arrange 2 anchor cables on the top,and to reinforce them with grouting.On site practice showed that the optimized support scheme can ensure safe mining of the working face.
作者 徐庆 XU Qing(Qingciyao Coal Mine of Dimei Company,Jinneng Holding Coal Industry Group,Datong 037000,Shanxi,China)
出处 《能源与节能》 2024年第11期150-152,共3页 Energy and Energy Conservation
关键词 支承压力 支护方式 围岩变形 注浆加固 bearing pressure support method surrounding rock deformation grouting reinforcement
  • 相关文献

参考文献4

二级参考文献58

共引文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部