期刊文献+

西20-1X井尾管固井工艺技术 被引量:2

LINER CEMENTING TECHNOLOGY FOR WELL XI20-1X
在线阅读 下载PDF
导出
摘要 西 2 0 - 1X井是西 2 0断块上的 1口三开定向开发井 ,目的层为寒武系府君山组。该井潜山盖层复杂 ,技术套管未能坐入潜山 ,三开后发生严重漏失 ,无法建立循环 ,用常规固井工艺技术无法固井 ,采用尾管悬挂器、管外封隔器及配套工具等新工艺技术达到了优质固井的目的。 Well Xi20 1X is a directional development well in Block Xi20, with its target formation in the Cambrian system. As the overlaying cover formations were very complicated, the intermediate casing failed to set in the buried hill, and severe lost circulation took place after drilling into the third section, as worse as no circulation could be established. In this case, the conventional cementing techniques couldn't meet the cementing requirements in this well, while new techniques involving the use of liner hanger, external casing packer and other auxiliary tools fulfilled the goal of excellent cementing.
机构地区 华北石油管理局
出处 《石油钻采工艺》 CAS CSCD 北大核心 2002年第6期21-22,共2页 Oil Drilling & Production Technology
关键词 西20-1X井 尾管 固井 工艺技术 管外封隔器 油气井 directional well lost circulation liner cementing external casing packer
  • 相关文献

同被引文献31

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部