期刊文献+

高填石路堤工后沉降分析及工程算法探讨 被引量:35

Study on Settlement of High Fill Rock Embankment After Construction and Its Engineering Algorithm
在线阅读 下载PDF
导出
摘要 以工程界熟悉的分层总和法为基础,分别对路基和填石路堤进行了沉降分析与计算;再借助依托工程的沉降观测资料,提出了高填石路堤工后沉降的工程计算方法,最后给出了计算实例及工程分析. The analysis and calculation method about the settlement of both surface and rock embankment was discussed based on the layerwise summation method which is usually used in engineering;Then,a new engineering algorithm about the settlement of high fill rock embankment after construction, which is according to the observation and analytical information to the backing engineering, was put forward, and a calculation and analysis to a practical engineering example was given.
出处 《湖南大学学报(自然科学版)》 EI CAS CSCD 北大核心 2002年第6期112-117,共6页 Journal of Hunan University:Natural Sciences
关键词 高填石路堤 沉降分析 工后沉降 工程计算方法 软土路基 最终沉降量 rock embankment of high fill settlement analysis and calculation settlement after construction engineering algorithm
  • 相关文献

参考文献3

二级参考文献8

  • 1团体著者,土力学及岩石力学,1979年
  • 2李君纯,土石坝工程,1990年,1/2期,58页
  • 3张苏民,岩土工程学报,1990年,4期,22页
  • 4左元明,1989年
  • 5李雷,水利水运科学研究,1986年,3期,62页
  • 6JTJ 024-1985.公路桥涵地基与基础设计规范[S],1985.
  • 7华东水利学院力学教研室.土工原理与计算[M]水利出版社,1980.
  • 8韩世莲,周虎鑫,陈荣生.土和碎石混合料的蠕变试验研究[J].岩土工程学报,1999,21(2):196-199. 被引量:27

共引文献20

同被引文献193

引证文献35

二级引证文献161

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部