期刊文献+

大型“货改耙”——12000m^3耙吸挖泥船改装设计 被引量:2

Conversion design of cargo ship to 12 000 m^3 trailing suction hopper dredge
在线阅读 下载PDF
导出
摘要 建造一艘大型耙吸挖泥船需耗资数亿 ,且周期长 ,投产见效慢。上海航道局提出“货改耙”的创造性设想 ,并付诸实施 ,闯出了一条花较少的投资 ,在较短的周期内 ,扩大疏浚能力应对市场急需的新途径。本文就首例大型“货改耙” It costs millions Yuan RMB of capital expenditure, long period of time and long pay back time to build a newbuilding large trailing suction hopper dredge. So, Shanghai Dredging Bureau expounds and carries out a creative concept of converting a cargo ship to a dredge. It is proved a new way to enlarge the dredging capacity in short time to meet the pressing demand of the market. This paper gives a brief introduction of the conversion design of this first cargo ship conversion for a new dredge named 'NEW WALRUS'.
出处 《船舶》 北大核心 2002年第6期4-10,共7页 Ship & Boat
关键词 大型“货改耙” 大型耗吸挖泥船 改装设计 cargo ship converted to dredge large trailing suction hopper dredge conversion design
  • 相关文献

同被引文献12

  • 1[1]中国疏浚协会.中国疏浚业发展战略研究[R].交通部科教司,2005.
  • 2[4]Lange Wapper.Shallow-draught,high-capacity dredger[J].Signficant Ships of 1999.
  • 3[5]Dragheads-May gears practical experience[J].P & D,IHC Holland,2002,157 期.
  • 4三菱重工业株式会社.10 000 m3トレ-リニケサクツョソ浚渫船[MECCA][J].作业船,2005,(77).
  • 5Gees De Keizer.船桥技术一体化--定位及跟踪[J].DPC(中文版),2003,(1).
  • 6中国疏浚协会.中国疏浚业发展战略研究[R].交通部科教司研究课题资料.2005版
  • 7LANGE WAPPER: shallow-draught, high-capacity dredger[J].SIGNIFICANT SHIPS. 1999
  • 8Dragheads-May gears practical experience[J]. 《P&D》IHC HOLLAND. 2002 年 157期.
  • 9Cees De Keizer.船桥技术一体化—定位及跟踪[M].《DPC》(中文版).2003(1)
  • 10三菱重工业株式会社.10000m^3トレ-リニケサクッヨソ浚渫船[MECCA][J].作业船.2005,277期

引证文献2

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部