瀑布沟水电站泄洪洞开挖变形和稳定性分析 被引量:7

Excavation Deformation and Stability Ana lysis of Spillway Tunnel of Pubuguo Hydr opower Station
在线阅读 下载PDF
导出
摘要 瀑布沟水电站泄洪洞右侧壁最小厚度仅约10 0m,左侧山体高达100 0m,隧洞偏压问题突出。本文采用非线性有限元法,研究隧洞在开挖过程中,边坡的稳定性和隧洞的偏压应力。 The minimum depth of the spillway tunnel from the slope s urface on the right side is only 10m whi le on the spillway left side the mountia n has a height of 100m.Therefore,the in situ stress on the right side of the spi llway tunnel is much higher than that on the left side.In this paper stability o f the slope and unbalanced side pressure of the spillway tunnel during its excav ation are studied by using nonlinear fin ite element method.
出处 《水电站设计》 2003年第2期18-22,共5页 Design of Hydroelectric Power Station
关键词 瀑布沟水电站 泄洪洞 开挖 变形 稳定性 隧洞 非线性 spillway tunn el tu nnel excavation deformation of rock mass stability analysis finite element metho d Pubuguo Hydropower Station
  • 相关文献

参考文献2

共引文献4

同被引文献20

引证文献7

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部