摘要
介绍 10 0 0 0m3天然气球罐无中心柱的组装方法 ,实践证明该方法作业时间短、应力小 。
Beijing nature gas company had owned 4 sets of 10000m 3 nature gas sphere in Xiaotun storage plant and had 2 sets in the north-suburbs storage plant. It is the municipal major engineering in Beijing in 2000. The project was designed and manufactured by the CMP/ENTERPOSE Franc, assembled and welded by the sphere engineering company of China national chemical engineering.Assemble technique for 10000m 3 nature gas spherical tanks of non-temporary column was introduced.By practial means of proved,has been useable,worktime short,stress small though test.It was ideal construction process for the heavy sphere at present.
出处
《压力容器》
2003年第4期23-25,46,共4页
Pressure Vessel Technology