基于最大龙口流速指标的立堵截流施工风险随机模拟研究 被引量:7

Study of stochastic simulation of risks in end-tipped closure works system construction
在线阅读 下载PDF
导出
摘要 截流系统受到水文水力等随机因素的影响,因此,设计的截流方案的风险如何是需要全面考虑的。本文从截流系统的风险认识入手,确定出能够反映截流系统风险的系统量,在理论分析的基础上,提出采用随机模拟计算方法来计算既考虑水文不确定性又考虑水力不确定性的截流系统风险计算方法,实例验证该方法的可行性。从而可以为截流系统的方案设计与比较起到辅助决策作用。 In analyzing risks of closure works system, the authors took into account of all the risk factors for designing closure works system, which are influenced by random factors of hydraulics and hydrology. The variables of the closure works system risks were defined. A set of calculation methods of using stochastic simulation to study the closure works system risks were presented on the basis of theoretical analysis. The result of case study showed that the methods were feasible and can be applied as an assistant tool in designing and selecting closure works system scheme.
出处 《水利学报》 EI CSCD 北大核心 2003年第4期15-19,23,共6页 Journal of Hydraulic Engineering
关键词 截流系统 风险分析 随机模拟 closure works system risk analysis stochastic simulation
  • 相关文献

参考文献5

  • 1周宜红,胡志根.施工截流系统风险率研究[J].水电能源科学,1996,14(3):171-175. 被引量:14
  • 2水利部.水利水电工程设计洪水计算手册[M].北京:水利电力出版社,1995,1..
  • 3钟登华 米子明.导流隧洞泄洪能力的可靠性分析[J].天津大学学报,2001,(3).
  • 4Baukuneeht K, Nef W. Digital Simulation [ M]. Springer Verlag, 1971.
  • 5Jansson B. Random Number Generators [M]. Stocholm, 1966.

共引文献16

同被引文献45

引证文献7

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部