This test will be to simulate actual drilling operations to prove that the rig functions as a unit as laid out in the design specifications. The testing is to further demonstrate that equipment and systems maintain th...This test will be to simulate actual drilling operations to prove that the rig functions as a unit as laid out in the design specifications. The testing is to further demonstrate that equipment and systems maintain their operability for an extended period and will highlight any problematic areas within the system designs or equipment suitability. All systems shall be operated in the fully automatic mode as designed.展开更多
文摘This test will be to simulate actual drilling operations to prove that the rig functions as a unit as laid out in the design specifications. The testing is to further demonstrate that equipment and systems maintain their operability for an extended period and will highlight any problematic areas within the system designs or equipment suitability. All systems shall be operated in the fully automatic mode as designed.