Transmission network expansion planning (TNEP) is a challenging issue especially in new restructured electricity mar-kets environment. TNEP can be incorporated with reactive power planning in which the operating condi...Transmission network expansion planning (TNEP) is a challenging issue especially in new restructured electricity mar-kets environment. TNEP can be incorporated with reactive power planning in which the operating conditions will be satisfied. In this paper a combinatorial mathematical model has been presented to solve transmission expansion and reactive power planning problem (TEPRPP) simultaneously. The proposed model is a non-convex problem having a mixed integer nonlinear nature where the number of candidate solutions to be evaluated increases exponentially according to the system size. The objective function of TEPRPP comprises the new circuits’ investment and production costs as well as load curtailment penalty payments. A real genetic algorithm (RGA) aimed to obtaining a significant quality solution to handle such a complicated problem has been employed. An interior point method (IPM) is applied to solve the proposed concurrent optimization problem in the solution steps of TEPRPP model. This paper proposes a new methodology for the best location as well as the capacity of VAr sources;it is tested on two well-known systems;the Garver and IEEE 24-bus systems. The obtained results show the capability and the viability of the proposed TEPRPP model incorporating operating conditions.展开更多
Aiming at the faults of some weak nodes in the concentrated solar power-photovoltaic(CSP-PV)hybrid power generation system,it is impossible to restore the transient voltage only relying on the reactive power regulatio...Aiming at the faults of some weak nodes in the concentrated solar power-photovoltaic(CSP-PV)hybrid power generation system,it is impossible to restore the transient voltage only relying on the reactive power regulation capability of the system itself.We propose a dynamic reactive power planning method suitable for CSP-PV hybrid power generation system.The method determines the installation node of the dynamic reactive power compensation device and its compensation capacity based on the reactive power adjustment capability of the system itself.The critical fault node is determined by the transient voltage stability recovery index,and the weak node of the system is initially determined.Based on this,the sensitivity index is used to determine the installation node of the dynamic reactive power compensation device.Dynamic reactive power planning optimization model is established with the lowest investment cost of dynamic reactive power compensation device and the improvement of system transient voltage stability.Furthermore,the component of the reactive power compensation node is optimized by particle swarm optimization based on differential evolution(DE-PSO).The simulation results of the example system show that compared with the dynamic position compensation device installation location optimization method,the proposed method can improve the transient voltage stability of the system under the same reactive power compensation cost.展开更多
The capacitive reactive power reversal in the urban distribution grid is increasingly prominent at the period of light load in the last years.In severe cases,it will endanger the security and stability of power grid.T...The capacitive reactive power reversal in the urban distribution grid is increasingly prominent at the period of light load in the last years.In severe cases,it will endanger the security and stability of power grid.This paper presents an optimal reactive power compensation method of distribution network to prevent reactive power reverse.Firstly,an integrated reactive power planning(RPP)model with power factor constraints is established.Capacitors and reactors are considered to be installed in the distribution system at the same time.The objective function is the cost minimization of compensation and real power loss with transformers and lines during the planning period.Nodal power factor limits and reactor capacity constraints are new constraints.Then,power factor sensitivity with respect to reactive power is derived.An improved genetic algorithm by power factor sensitivity is used to solve the model.The optimal locations and sizes of reactors and capacitors can avoid reactive power reversal and power factor exceeding the limit.Finally,the effectiveness of the model and algorithm is proven by a typical high-voltage distribution network.展开更多
This paper proposes to use the power system simulation software CYME to plan, model and simulate for an actual distribution network for improving the reliability and efficiency, enhancing the efficiency and capacity, ...This paper proposes to use the power system simulation software CYME to plan, model and simulate for an actual distribution network for improving the reliability and efficiency, enhancing the efficiency and capacity, simulating the abnormal condition of distribution network, and presenting operation program of safe, reliable and having simulation record statements. The modeling simulation results show that the software module has lots of advantages including high accuracy, ideal reliability, powerful practicality in simulation and analysis of distribution network, it only need to create once model, the model can sufficiently satisfy multifarious types of simulation analysis required for the distribution network planning.展开更多
In view of the reactive power coordination difficulties caused by reactive power strong coupling,the provincial power grids in the interconnected system are formed by the multi-AC/DC transmission.Wind power channels a...In view of the reactive power coordination difficulties caused by reactive power strong coupling,the provincial power grids in the interconnected system are formed by the multi-AC/DC transmission.Wind power channels are under the conditions of large-scale long-distance transmission of wind power and other forms of renewable power generation.The AC-DC hybrid power flow equation of the interconnected system,including the AC-DC tie lines,is presented in this paper,along with the robust dynamic evolutionary optimization of the reactive power system in interconnected systems under fluctuating and uncertain wind power conditions.Therefore,the rapid collaborative optimization of reactive power flow and the exchange of reactive power between tie lines between provincial power grids are realized.The analysis was made by taking four interconnected large-scale provincial power grids of Eastern Mongolia,Jilin,Liaoning and Shandong as an example.The simulation results demonstrate the effectiveness and superiority of the proposed reactive power dynamic multi-objective optimization method for interconnected power grids.展开更多
This paper formulates and solves a techno-economic planning problem of reactive power (VAR) in power transmission systems under loadings. The objective of the proposed research work is to minimize the combination of i...This paper formulates and solves a techno-economic planning problem of reactive power (VAR) in power transmission systems under loadings. The objective of the proposed research work is to minimize the combination of installation cost of reactive power sources, power losses and operational cost while satisfying technical constraints. Initially, the positions for the placement of reactive power sources are determined technically. Different cost components such as VAR generation cost, line charging cost etc. are then added in the total operating cost in a most economical way. Finally, the optimal parameter setting subjected to reactive power planning (RPP) is obtained by taking advantages of hybrid soft computing techniques. For the justification of the efficiency and efficacy of the proposed approach the entire work is simulated on two inter-regional transmission networks. To validate the robustness and ease of the soft computing techniques in RPP the responses of benchmark functions and statistical proof are provided simultaneously.展开更多
Because of the randomness of wind power and photovoltaic(PV)output of new energy bases,the problem of peak regulation capability and voltage stability of ultra-high voltage direct current(UHVDC)transmission lines,we p...Because of the randomness of wind power and photovoltaic(PV)output of new energy bases,the problem of peak regulation capability and voltage stability of ultra-high voltage direct current(UHVDC)transmission lines,we proposed an optimum allocation method of installed capacity of the solar-thermal power station based on chance constrained programming in this work.Firstly,we established the uncertainty model of wind power and PV based on the chance constrained planning theory.Then we used the K-medoids clusteringmethod to cluster the scenarios considering the actual operation scenarios throughout the year.Secondly,we established the optimal configuration model based on the objective function of the strongest transient voltage stability and the lowest overall cost of operation.Finally,by quantitative analysis of actual wind power and photovoltaic new energy base,this work verified the feasibility of the proposed method.As a result of the simulations,we found that using the optimal configuration method of solar-thermal power stations could ensure an accurate allocation of installed capacity.When the installed capacity of the solar-thermal power station is 1×106 kW,the transient voltage recovery index(TVRI)is 0.359,which has a strong voltage support capacity for the system.Based on the results of this work,the optimal configuration of the installed capacity of the solar-thermal power plant can improve peak shaving performance,transient voltage support capability,and new energy consumption while satisfying the Direct Current(DC)outgoing transmission premise.展开更多
As high amounts of new energy and electric vehicle(EV)charging stations are connected to the distribution network,the voltage deviations are likely to occur,which will further affect the power quality.It is challengin...As high amounts of new energy and electric vehicle(EV)charging stations are connected to the distribution network,the voltage deviations are likely to occur,which will further affect the power quality.It is challenging to manage high quality voltage control of a distribution network only relying on the traditional reactive power control mode.If the reactive power regulation potentials of new energy and EVs can be tapped,it will greatly reduce the reactive power optimization pressure on the network.Keeping this in mind,our reasearch first adds EVs to the traditional distribution network model with new forms of energy,and then a multi-objective optimization model,with achieving the lowest line loss,voltage deviation,and the highest static voltage stability margin as its objectives,is constructed.Meanwihile,the corresponding model parameters are set under different climate and equipment conditions.Ultimately,the optimization model under specific scenarios is obtained.Furthermore,considering the supply and demand relation-ship of the network,an improved technique for order preference by similarity to an ideal solution decision method is proposed,which aims to judge the adaptability of different algorithms to the optimized model,so as to select a most suitable algorithm for the problem.Finally,a comparison is made between the constructed model and a model without new energy.The results reveal that the constructed model can provide a high quality reactive power regula-tion strategy.展开更多
The deployment of dynamic reactive power sourcecan effectively improve the voltage performance after a disturbance for a power system with increasing wind power penetration level and ubiquitous induction loads.To impr...The deployment of dynamic reactive power sourcecan effectively improve the voltage performance after a disturbance for a power system with increasing wind power penetration level and ubiquitous induction loads.To improve the voltage stability of the power system,this paper proposes an adaptive many-objective robust optimization model to deal with thedeployment issue of dynamic reactive power sources.Firstly,two metrics are adopted to assess the voltage stability of the system at two different stages,and one metric is proposed to assess the tie-line reactive power flow.Then,a robustness index isdeveloped to assess the sensitivity of a solution when subjectedto operational uncertainties,using the estimation of acceptablesensitivity region(ASR)and D-vine Copula.Five objectives areoptimized simultaneously:①total equipment investment;②adaptive short-term voltage stability evaluation;③tie-line power flow evaluation;④prioritized steady-state voltage stabilityevaluation;and⑤robustness evaluation.Finally,an anglebased adaptive many-objective evolutionary algorithm(MaOEA)is developed with two improvements designed for the application in a practical engineering problem:①adaptive mutationrate;and②elimination procedure without a requirement for athreshold value.The proposed model is verified on a modifiedNordic 74-bus system and a real-world power system.Numerical results demonstrate the effectiveness and efficiency of theproposed model.展开更多
文摘Transmission network expansion planning (TNEP) is a challenging issue especially in new restructured electricity mar-kets environment. TNEP can be incorporated with reactive power planning in which the operating conditions will be satisfied. In this paper a combinatorial mathematical model has been presented to solve transmission expansion and reactive power planning problem (TEPRPP) simultaneously. The proposed model is a non-convex problem having a mixed integer nonlinear nature where the number of candidate solutions to be evaluated increases exponentially according to the system size. The objective function of TEPRPP comprises the new circuits’ investment and production costs as well as load curtailment penalty payments. A real genetic algorithm (RGA) aimed to obtaining a significant quality solution to handle such a complicated problem has been employed. An interior point method (IPM) is applied to solve the proposed concurrent optimization problem in the solution steps of TEPRPP model. This paper proposes a new methodology for the best location as well as the capacity of VAr sources;it is tested on two well-known systems;the Garver and IEEE 24-bus systems. The obtained results show the capability and the viability of the proposed TEPRPP model incorporating operating conditions.
基金Science and Technology Projects of State Grid Corporation of China(No.SGGSKY00FJJS1800140)。
文摘Aiming at the faults of some weak nodes in the concentrated solar power-photovoltaic(CSP-PV)hybrid power generation system,it is impossible to restore the transient voltage only relying on the reactive power regulation capability of the system itself.We propose a dynamic reactive power planning method suitable for CSP-PV hybrid power generation system.The method determines the installation node of the dynamic reactive power compensation device and its compensation capacity based on the reactive power adjustment capability of the system itself.The critical fault node is determined by the transient voltage stability recovery index,and the weak node of the system is initially determined.Based on this,the sensitivity index is used to determine the installation node of the dynamic reactive power compensation device.Dynamic reactive power planning optimization model is established with the lowest investment cost of dynamic reactive power compensation device and the improvement of system transient voltage stability.Furthermore,the component of the reactive power compensation node is optimized by particle swarm optimization based on differential evolution(DE-PSO).The simulation results of the example system show that compared with the dynamic position compensation device installation location optimization method,the proposed method can improve the transient voltage stability of the system under the same reactive power compensation cost.
文摘The capacitive reactive power reversal in the urban distribution grid is increasingly prominent at the period of light load in the last years.In severe cases,it will endanger the security and stability of power grid.This paper presents an optimal reactive power compensation method of distribution network to prevent reactive power reverse.Firstly,an integrated reactive power planning(RPP)model with power factor constraints is established.Capacitors and reactors are considered to be installed in the distribution system at the same time.The objective function is the cost minimization of compensation and real power loss with transformers and lines during the planning period.Nodal power factor limits and reactor capacity constraints are new constraints.Then,power factor sensitivity with respect to reactive power is derived.An improved genetic algorithm by power factor sensitivity is used to solve the model.The optimal locations and sizes of reactors and capacitors can avoid reactive power reversal and power factor exceeding the limit.Finally,the effectiveness of the model and algorithm is proven by a typical high-voltage distribution network.
文摘This paper proposes to use the power system simulation software CYME to plan, model and simulate for an actual distribution network for improving the reliability and efficiency, enhancing the efficiency and capacity, simulating the abnormal condition of distribution network, and presenting operation program of safe, reliable and having simulation record statements. The modeling simulation results show that the software module has lots of advantages including high accuracy, ideal reliability, powerful practicality in simulation and analysis of distribution network, it only need to create once model, the model can sufficiently satisfy multifarious types of simulation analysis required for the distribution network planning.
基金This work was supported by the National Key Research and Development Program of China under Grant No.2017YFB0902100.
文摘In view of the reactive power coordination difficulties caused by reactive power strong coupling,the provincial power grids in the interconnected system are formed by the multi-AC/DC transmission.Wind power channels are under the conditions of large-scale long-distance transmission of wind power and other forms of renewable power generation.The AC-DC hybrid power flow equation of the interconnected system,including the AC-DC tie lines,is presented in this paper,along with the robust dynamic evolutionary optimization of the reactive power system in interconnected systems under fluctuating and uncertain wind power conditions.Therefore,the rapid collaborative optimization of reactive power flow and the exchange of reactive power between tie lines between provincial power grids are realized.The analysis was made by taking four interconnected large-scale provincial power grids of Eastern Mongolia,Jilin,Liaoning and Shandong as an example.The simulation results demonstrate the effectiveness and superiority of the proposed reactive power dynamic multi-objective optimization method for interconnected power grids.
文摘This paper formulates and solves a techno-economic planning problem of reactive power (VAR) in power transmission systems under loadings. The objective of the proposed research work is to minimize the combination of installation cost of reactive power sources, power losses and operational cost while satisfying technical constraints. Initially, the positions for the placement of reactive power sources are determined technically. Different cost components such as VAR generation cost, line charging cost etc. are then added in the total operating cost in a most economical way. Finally, the optimal parameter setting subjected to reactive power planning (RPP) is obtained by taking advantages of hybrid soft computing techniques. For the justification of the efficiency and efficacy of the proposed approach the entire work is simulated on two inter-regional transmission networks. To validate the robustness and ease of the soft computing techniques in RPP the responses of benchmark functions and statistical proof are provided simultaneously.
基金funded by Major Science and Technology Projects in Gansu Province(19ZD2GA003).
文摘Because of the randomness of wind power and photovoltaic(PV)output of new energy bases,the problem of peak regulation capability and voltage stability of ultra-high voltage direct current(UHVDC)transmission lines,we proposed an optimum allocation method of installed capacity of the solar-thermal power station based on chance constrained programming in this work.Firstly,we established the uncertainty model of wind power and PV based on the chance constrained planning theory.Then we used the K-medoids clusteringmethod to cluster the scenarios considering the actual operation scenarios throughout the year.Secondly,we established the optimal configuration model based on the objective function of the strongest transient voltage stability and the lowest overall cost of operation.Finally,by quantitative analysis of actual wind power and photovoltaic new energy base,this work verified the feasibility of the proposed method.As a result of the simulations,we found that using the optimal configuration method of solar-thermal power stations could ensure an accurate allocation of installed capacity.When the installed capacity of the solar-thermal power station is 1×106 kW,the transient voltage recovery index(TVRI)is 0.359,which has a strong voltage support capacity for the system.Based on the results of this work,the optimal configuration of the installed capacity of the solar-thermal power plant can improve peak shaving performance,transient voltage support capability,and new energy consumption while satisfying the Direct Current(DC)outgoing transmission premise.
基金supported by National Key R&D Program of China (2021ZD0111502)National Natural Science Foundation of China (51907112,U2066212)+1 种基金Natural Science Foundation of Guangdong Province of China (2019A1515011671,2021A1515011709)Scientific Research Staring Foundation of Shantou University (NTF19028,NTF20009).
文摘As high amounts of new energy and electric vehicle(EV)charging stations are connected to the distribution network,the voltage deviations are likely to occur,which will further affect the power quality.It is challenging to manage high quality voltage control of a distribution network only relying on the traditional reactive power control mode.If the reactive power regulation potentials of new energy and EVs can be tapped,it will greatly reduce the reactive power optimization pressure on the network.Keeping this in mind,our reasearch first adds EVs to the traditional distribution network model with new forms of energy,and then a multi-objective optimization model,with achieving the lowest line loss,voltage deviation,and the highest static voltage stability margin as its objectives,is constructed.Meanwihile,the corresponding model parameters are set under different climate and equipment conditions.Ultimately,the optimization model under specific scenarios is obtained.Furthermore,considering the supply and demand relation-ship of the network,an improved technique for order preference by similarity to an ideal solution decision method is proposed,which aims to judge the adaptability of different algorithms to the optimized model,so as to select a most suitable algorithm for the problem.Finally,a comparison is made between the constructed model and a model without new energy.The results reveal that the constructed model can provide a high quality reactive power regula-tion strategy.
基金supported by the International Postdoctoral Exchange Fellowship Program (Talent-Introduction Program)(No.YJ20210337)the Fundamental Research Funds for the Central Universities (No.2022CDJXY-007)。
文摘The deployment of dynamic reactive power sourcecan effectively improve the voltage performance after a disturbance for a power system with increasing wind power penetration level and ubiquitous induction loads.To improve the voltage stability of the power system,this paper proposes an adaptive many-objective robust optimization model to deal with thedeployment issue of dynamic reactive power sources.Firstly,two metrics are adopted to assess the voltage stability of the system at two different stages,and one metric is proposed to assess the tie-line reactive power flow.Then,a robustness index isdeveloped to assess the sensitivity of a solution when subjectedto operational uncertainties,using the estimation of acceptablesensitivity region(ASR)and D-vine Copula.Five objectives areoptimized simultaneously:①total equipment investment;②adaptive short-term voltage stability evaluation;③tie-line power flow evaluation;④prioritized steady-state voltage stabilityevaluation;and⑤robustness evaluation.Finally,an anglebased adaptive many-objective evolutionary algorithm(MaOEA)is developed with two improvements designed for the application in a practical engineering problem:①adaptive mutationrate;and②elimination procedure without a requirement for athreshold value.The proposed model is verified on a modifiedNordic 74-bus system and a real-world power system.Numerical results demonstrate the effectiveness and efficiency of theproposed model.