Mine overburden dumps have posed significant safety issues in the operations of various unit operations of open pit min-ing especially the external dumps. The external dumps are composed of a mixture of fragmented roc...Mine overburden dumps have posed significant safety issues in the operations of various unit operations of open pit min-ing especially the external dumps. The external dumps are composed of a mixture of fragmented rocks and loose soil. Their charac-teristic is comparable to heavily discontinuous solid mass. The conventional approach of limit equilibrium methods provide safety factors for the slope but nothing about the stress-strain characteristics of the large dump mass. The designs of dump location and their respective geometry are integrated for the know-how of the stability characteristics of these dumps. The discrete element method uses a circular disk to represent the granular solid mass and their interactions are described by the Newton’s third law of motion. The displacement is described by the sliding of the circular disk. This work is focused on the modeling efficiency of the discrete element methods to represent the behaviour of mine dump masses with the specified joint plane for the limit equilibrium method. The advantage of the work lies on the ease of information retrieval at any point at the dump mass concerning the stress and strain histories, displacement, failures etc. which when integrated produces a better understanding of the stability of the dump masses.展开更多
The layout of the buckets for tunnel boring machine(TBM)directly affects the muck removal efficiency of cutterhead during excavation.In order to improve the muck removal performance for TBM,the optimal design of bucke...The layout of the buckets for tunnel boring machine(TBM)directly affects the muck removal efficiency of cutterhead during excavation.In order to improve the muck removal performance for TBM,the optimal design of bucket layout was investigated.The whole muck transfer process was simulated by discrete-element method(DEM),including the muck falling,colliding,pilling up,shoveling and transferring into the hopper.The muck model was established based on size distribution analysis of muck samples from the water-supply tunnel project in Jilin Province,China.Then,the influence of the bucket number and the interval angle between buckets on muck removal performance was investigated.The results indicated that,as the number of buckets increased from four to eight,the removed muck increased by 29%and the residual volume decreased by 40.5%,and the process became steadier.Different interval angles between buckets were corresponding to different removed muck irregularly,but the residual muck number increased generally with the angles.The optimal layout of buckets for the cutterhead in this tunnel project was obtained based on the simulation results,and the muck removal performance of the TBM was verified by the actual data in the engineering construction.展开更多
In order to obtain an expected numerical solution, a fully discrete discontinuous Galerkin method is applied to a kind of reactive transport problems in two dimension. That is to say, the space variable is discretized...In order to obtain an expected numerical solution, a fully discrete discontinuous Galerkin method is applied to a kind of reactive transport problems in two dimension. That is to say, the space variable is discretized with the symmetric interior penalty Calerkin method (SIPG), and the time variable is done with the backward Euler method. Making use of the duality technique, hp approximation properties and the interpolation theory, a residual-type a posteriori error estimation is achieved, which can be used for adaptivity. Compared with the analyses of semi-discretization, the current presentation is more challenging and more significant.展开更多
文摘Mine overburden dumps have posed significant safety issues in the operations of various unit operations of open pit min-ing especially the external dumps. The external dumps are composed of a mixture of fragmented rocks and loose soil. Their charac-teristic is comparable to heavily discontinuous solid mass. The conventional approach of limit equilibrium methods provide safety factors for the slope but nothing about the stress-strain characteristics of the large dump mass. The designs of dump location and their respective geometry are integrated for the know-how of the stability characteristics of these dumps. The discrete element method uses a circular disk to represent the granular solid mass and their interactions are described by the Newton’s third law of motion. The displacement is described by the sliding of the circular disk. This work is focused on the modeling efficiency of the discrete element methods to represent the behaviour of mine dump masses with the specified joint plane for the limit equilibrium method. The advantage of the work lies on the ease of information retrieval at any point at the dump mass concerning the stress and strain histories, displacement, failures etc. which when integrated produces a better understanding of the stability of the dump masses.
基金Project(51475478)supported by the National Natural Science Foundation of ChinaProject(2012AA041801)supported by the National High Technology Research and Development Program of China+1 种基金Project(2014FJ1002)supported by the Science and Technology Major Project of Hunan Province,ChinaProject(2013CB035401)supported by the National Basic Research Program of China。
文摘The layout of the buckets for tunnel boring machine(TBM)directly affects the muck removal efficiency of cutterhead during excavation.In order to improve the muck removal performance for TBM,the optimal design of bucket layout was investigated.The whole muck transfer process was simulated by discrete-element method(DEM),including the muck falling,colliding,pilling up,shoveling and transferring into the hopper.The muck model was established based on size distribution analysis of muck samples from the water-supply tunnel project in Jilin Province,China.Then,the influence of the bucket number and the interval angle between buckets on muck removal performance was investigated.The results indicated that,as the number of buckets increased from four to eight,the removed muck increased by 29%and the residual volume decreased by 40.5%,and the process became steadier.Different interval angles between buckets were corresponding to different removed muck irregularly,but the residual muck number increased generally with the angles.The optimal layout of buckets for the cutterhead in this tunnel project was obtained based on the simulation results,and the muck removal performance of the TBM was verified by the actual data in the engineering construction.
基金supported by Hunan Provincial Natural Science Foundation of China under Grant No. 10JJ3021Scientific Research Fund of Hunan Provincial Education Department under Grant No.11B032the Planned Science and Technology Project of Hunan Province and Aid program for Science and Technology Innovative Research Team in Higher Educational Institutions of Hunan Province
文摘In order to obtain an expected numerical solution, a fully discrete discontinuous Galerkin method is applied to a kind of reactive transport problems in two dimension. That is to say, the space variable is discretized with the symmetric interior penalty Calerkin method (SIPG), and the time variable is done with the backward Euler method. Making use of the duality technique, hp approximation properties and the interpolation theory, a residual-type a posteriori error estimation is achieved, which can be used for adaptivity. Compared with the analyses of semi-discretization, the current presentation is more challenging and more significant.