期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
施工项目成本预测 被引量:1
1
作者 李娜 《经济技术协作信息》 2011年第20期38-39,共2页
施工项目成本预测是项目成本控制的重要环节和工作内容。本文提出了明确施工项目成本预测的重要意义和作用;夯实项目成本预测基础,明确业务职责和经济责任;建立项目成本预测程序和项目成本预测应注意的问题;掌握项目成本预测方法,... 施工项目成本预测是项目成本控制的重要环节和工作内容。本文提出了明确施工项目成本预测的重要意义和作用;夯实项目成本预测基础,明确业务职责和经济责任;建立项目成本预测程序和项目成本预测应注意的问题;掌握项目成本预测方法,实施综合分析;依据工程项目成本预测的实际需要,选择项目成本预测方法。并进行研究和阐述。 展开更多
关键词 施工项目 成本预测 成本预测程序 成本预测方法
在线阅读 下载PDF
Influences of misprediction costs on solar flare prediction 被引量:5
2
作者 HUANG Xin WANG HuaNing DAI XingHua 《Science China(Physics,Mechanics & Astronomy)》 SCIE EI CAS 2012年第10期1956-1962,共7页
The mispredictive costs of flaring and non-flaring samples are different for different applications of solar flare prediction.Hence,solar flare prediction is considered a cost sensitive problem.A cost sensitive solar ... The mispredictive costs of flaring and non-flaring samples are different for different applications of solar flare prediction.Hence,solar flare prediction is considered a cost sensitive problem.A cost sensitive solar flare prediction model is built by modifying the basic decision tree algorithm.Inconsistency rate with the exhaustive search strategy is used to determine the optimal combination of magnetic field parameters in an active region.These selected parameters are applied as the inputs of the solar flare prediction model.The performance of the cost sensitive solar flare prediction model is evaluated for the different thresholds of solar flares.It is found that more flaring samples are correctly predicted and more non-flaring samples are wrongly predicted with the increase of the cost for wrongly predicting flaring samples as non-flaring samples,and the larger cost of wrongly predicting flaring samples as non-flaring samples is required for the higher threshold of solar flares.This can be considered as the guide line for choosing proper cost to meet the requirements in different applications. 展开更多
关键词 flares: forecasting sun: magnetic field cost sensitive learning
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部