One of the largest known megafloods on earth resulted from a glacier dam-break,which occurred during the Late Quaternary in the Altai Mountains in Southern Siberia.Computational modeling is one of the viable approache...One of the largest known megafloods on earth resulted from a glacier dam-break,which occurred during the Late Quaternary in the Altai Mountains in Southern Siberia.Computational modeling is one of the viable approaches to enhancing the understanding of the flood events.The computational domain of this flood is over 9460 km2 and about 3.784 × 106 cells are involved as a 50 m × 50 m mesh is used,which necessitates a computationally efficient model.Here the Open MP(Open Multiprocessing) technique is adopted to parallelize the code of a coupled 2D hydrodynamic and sediment transport model.It is shown that the computational efficiency is enhanced by over 80% due to the parallelization.The floods over both fixed and mobile beds are well reproduced with specified discharge hydrographs at the dam site.Qualitatively,backwater effects during the flood are resolved at the bifurcation between the Chuja and Katun rivers.Quantitatively,the computed maximum stage and thalweg are physically consistent with the field data of the bars and deposits.The effects of sediment transport and morphological evolution on the flood are considerable.Sensitivity analyses indicate that the impact of the peak discharge is significant,whilst those of the Manningroughness,medium sediment size and shape of the inlet discharge hydrograph are marginal.展开更多
Rivers often witness non-uniform bed load sedim ent transport. For a long tim e, non-uniform bed load transport has been assum ed to be at capacity regime determined exclusively by local flow. Yet whether the capacity...Rivers often witness non-uniform bed load sedim ent transport. For a long tim e, non-uniform bed load transport has been assum ed to be at capacity regime determined exclusively by local flow. Yet whether the capacity assumption for non-uniform bed load transport is justified remains poorly understood. Here, the relative time scale of non-uniform bed load transport is evaluated and non-capacity and capacity models are compared for both aggradation and degradation cases with observed data. As characterized by its relative time scale, the adaptation of non-uniform bed load to capacity regime should be fulfilled quickly. However, changes in the flow and sedim ent inputs from upstream or tributaries hinder the adaptation. Also, the adaptation to capacity regime is size dependent, the finer the sediment size the slower the adaptation is, and vice versa. It is shown that the capacity model may entail considerable errors compared to the non-capacity model. For modelling of non-uniform bed load, non-capacity modelling is recommended, in which the temporal and spatial scales required for adaptation are explicitly appreciated.展开更多
Mosul dam is the biggest hydraulic structure in Iraq located on the River Tigris 60 km northwest of Mosul city. Its storage capacity is 11. 11 × 109 m3 and it had been in operation since 1986. A physical distorte...Mosul dam is the biggest hydraulic structure in Iraq located on the River Tigris 60 km northwest of Mosul city. Its storage capacity is 11. 11 × 109 m3 and it had been in operation since 1986. A physical distorted model with movable bed having a vertical scale 1: 100 and a horizontal scale 1:1000 was used to conduct the experiments relating the water level at the reservoir and water discharge upstream the reservoir with the bed load transport rate. The model represents the first 15 km of most northern part of Mosul dam reservoir. The construction of the model was based on bathymetric survey conducted in 2009. Twenty-four experiments were executed using four different discharges (0.5, 1.0, 1.5, and 2.0 L/s) which represent the average discharges in the flood period of River Tigris. At each individual discharge six operations were assumed where the reservoir's water level was 305, 307, 309, 310, 312, 315 meters above sea level respectively. In all the experiments conducted, bedload transport was measured in the physical model at section representing the River Tigris 1 km upstream the reservoir. The results showed that the bedload rate was decreasing when the water level within the reservoir was increasing. It was also evident that bedload transport rate dramatically decreased at level 310 meters above sea level onward. This is due to the fact that at this level represent the effect of backwater which was noticeable on the river cross section展开更多
In this paper we consider a Markov chain model in an ATM network, which has been studied by Dag and Stavrakakis. On the basis of the iterative formulas obtained by Dag and Stavrakakis, we obtain the explicit analytica...In this paper we consider a Markov chain model in an ATM network, which has been studied by Dag and Stavrakakis. On the basis of the iterative formulas obtained by Dag and Stavrakakis, we obtain the explicit analytical expression of the transition probability matrix. It is very simple to calculate the transition probabilities of the Markov chain by these expressions. In addition, we obtain some results about the structure of the transition probability matrix, which are helpful in numerical calculation and theoretical analysis.展开更多
基金funded by Natural Science Foundation of China (Grants No. 11172217 and 11432015)National Key Basic Research and Development Program (i.e., 973 Program) of China (Grant No. 2007CB714106)
文摘One of the largest known megafloods on earth resulted from a glacier dam-break,which occurred during the Late Quaternary in the Altai Mountains in Southern Siberia.Computational modeling is one of the viable approaches to enhancing the understanding of the flood events.The computational domain of this flood is over 9460 km2 and about 3.784 × 106 cells are involved as a 50 m × 50 m mesh is used,which necessitates a computationally efficient model.Here the Open MP(Open Multiprocessing) technique is adopted to parallelize the code of a coupled 2D hydrodynamic and sediment transport model.It is shown that the computational efficiency is enhanced by over 80% due to the parallelization.The floods over both fixed and mobile beds are well reproduced with specified discharge hydrographs at the dam site.Qualitatively,backwater effects during the flood are resolved at the bifurcation between the Chuja and Katun rivers.Quantitatively,the computed maximum stage and thalweg are physically consistent with the field data of the bars and deposits.The effects of sediment transport and morphological evolution on the flood are considerable.Sensitivity analyses indicate that the impact of the peak discharge is significant,whilst those of the Manningroughness,medium sediment size and shape of the inlet discharge hydrograph are marginal.
基金funded by the N atural Science Foundation of China (G rants No. 11172217, 51279144 and 11432015)Chinese Academy of Sciences (G rant No. KZZDEW -05-01-03)
文摘Rivers often witness non-uniform bed load sedim ent transport. For a long tim e, non-uniform bed load transport has been assum ed to be at capacity regime determined exclusively by local flow. Yet whether the capacity assumption for non-uniform bed load transport is justified remains poorly understood. Here, the relative time scale of non-uniform bed load transport is evaluated and non-capacity and capacity models are compared for both aggradation and degradation cases with observed data. As characterized by its relative time scale, the adaptation of non-uniform bed load to capacity regime should be fulfilled quickly. However, changes in the flow and sedim ent inputs from upstream or tributaries hinder the adaptation. Also, the adaptation to capacity regime is size dependent, the finer the sediment size the slower the adaptation is, and vice versa. It is shown that the capacity model may entail considerable errors compared to the non-capacity model. For modelling of non-uniform bed load, non-capacity modelling is recommended, in which the temporal and spatial scales required for adaptation are explicitly appreciated.
文摘Mosul dam is the biggest hydraulic structure in Iraq located on the River Tigris 60 km northwest of Mosul city. Its storage capacity is 11. 11 × 109 m3 and it had been in operation since 1986. A physical distorted model with movable bed having a vertical scale 1: 100 and a horizontal scale 1:1000 was used to conduct the experiments relating the water level at the reservoir and water discharge upstream the reservoir with the bed load transport rate. The model represents the first 15 km of most northern part of Mosul dam reservoir. The construction of the model was based on bathymetric survey conducted in 2009. Twenty-four experiments were executed using four different discharges (0.5, 1.0, 1.5, and 2.0 L/s) which represent the average discharges in the flood period of River Tigris. At each individual discharge six operations were assumed where the reservoir's water level was 305, 307, 309, 310, 312, 315 meters above sea level respectively. In all the experiments conducted, bedload transport was measured in the physical model at section representing the River Tigris 1 km upstream the reservoir. The results showed that the bedload rate was decreasing when the water level within the reservoir was increasing. It was also evident that bedload transport rate dramatically decreased at level 310 meters above sea level onward. This is due to the fact that at this level represent the effect of backwater which was noticeable on the river cross section
基金This work is supported by the National Key Project of China(No 970211017,the National Natural Science Foundation of China(No,10271102)and Hebei Province Doctoral Foundation(No.2002131)
文摘In this paper we consider a Markov chain model in an ATM network, which has been studied by Dag and Stavrakakis. On the basis of the iterative formulas obtained by Dag and Stavrakakis, we obtain the explicit analytical expression of the transition probability matrix. It is very simple to calculate the transition probabilities of the Markov chain by these expressions. In addition, we obtain some results about the structure of the transition probability matrix, which are helpful in numerical calculation and theoretical analysis.