Transmission network planning (TNP) is a large-scale, complex, with more non-linear discrete variables and the multi-objective constrained optimization problem. In the optimization process, the line investment, networ...Transmission network planning (TNP) is a large-scale, complex, with more non-linear discrete variables and the multi-objective constrained optimization problem. In the optimization process, the line investment, network reliability and the network loss are the main objective of transmission network planning. Combined with set pair analysis (SPA), particle swarm optimization (PSO), neural network (NN), a hybrid particle swarm optimization model was established with neural network and set pair analysis for transmission network planning (HPNS). Firstly, the contact degree of set pair analysis was introduced, the traditional goal set was converted into the collection of the three indicators including the identity degree, difference agree and contrary degree. On this bases, using shi(H), the three objective optimization problem was converted into single objective optimization problem. Secondly, using the fast and efficient search capabilities of PSO, the transmission network planning model based on set pair analysis was optimized. In the process of optimization, by improving the BP neural network constantly training so that the value of the fitness function of PSO becomes smaller in order to obtain the optimization program fitting the three objectives better. Finally, compared HPNS with PSO algorithm and the classic genetic algorithm, HPNS increased about 23% efficiency than THA, raised about 3.7% than PSO and improved about 2.96% than GA.展开更多
The paper mainly focuses on the network planning and optimization problem in the 5G telecommunication system based on the numerical investigation.There have been two portions of this work,such as network planning for ...The paper mainly focuses on the network planning and optimization problem in the 5G telecommunication system based on the numerical investigation.There have been two portions of this work,such as network planning for efficient network models and optimization of power allocation in the 5G network.The radio network planning process has been completed based on a specific area.The data rate requirement can be solved by allowing the densification of the system by deploying small cells.The radio network planning scheme is the indispensable platform in arranging a wireless network that encounters convinced coverage method,capacity,and Quality of Service necessities.In this study,the eighty micro base stations and two-hundred mobile stations are deployed in the-15km×15km wide selected area in the Yangon downtown area.The optimization processes were also analyzed based on the source and destination nodes in the 5G network.The base stations’location is minimized and optimized in a selected geographical area with the linear programming technique and analyzed in this study.展开更多
The author introduced particle swarm optimization as a new method for power transmission network expansion planning. A new discrete method for particle swarm optimization was developed,which is suitable for power tran...The author introduced particle swarm optimization as a new method for power transmission network expansion planning. A new discrete method for particle swarm optimization was developed,which is suitable for power transmission network expansion planning, and requires less computer s memory.The optimization fitness function construction, parameter selection, convergence judgement, and their characters were analyzod.Numerical simulation demonstrated the effectiveness and correctness or the method. This paper provides an academic and practical basis of particle swarm optimization in application of transmission network expansion planning for further investigation.展开更多
A distribution network plays an extremely important role in the safe and efficient operation of a power grid.As the core part of a power grid’s operation,a distribution network will have a significant impact on the s...A distribution network plays an extremely important role in the safe and efficient operation of a power grid.As the core part of a power grid’s operation,a distribution network will have a significant impact on the safety and reliability of residential electricity consumption.it is necessary to actively plan and modify the distribution network’s structure in the power grid,improve the quality of the distribution network,and optimize the planning of the distribution network,so that the network can be fully utilized to meet the needs of electricity consumption.In this paper,a distribution network grid planning algorithm based on the reliability of electricity consumption was completed using ant colony algorithm.For the distribution network structure planning of dual power sources,the parallel ant colony algorithm was used to prove that the premise of parallelism is the interactive process of ant colonies,and the dual power distribution network structure model is established based on the principle of the lowest cost.The artificial ants in the algorithm were compared with real ants in nature,and the basic steps and working principle of the ant colony optimization algorithm was studied with the help of the travelling salesman problem(TSP).Then,the limitations of the ant colony algorithm were analyzed,and an improvement strategy was proposed by using python for digital simulation.The results demonstrated the reliability of model-building and algorithm improvement.展开更多
Air route network(ARN)planning is an efficient way to alleviate civil aviation flight delays caused by increasing development and pressure for safe operation.Here,the ARN shortest path was taken as the objective funct...Air route network(ARN)planning is an efficient way to alleviate civil aviation flight delays caused by increasing development and pressure for safe operation.Here,the ARN shortest path was taken as the objective function,and an air route network node(ARNN)optimization model was developed to circumvent the restrictions imposed by″three areas″,also known as prohibited areas,restricted areas,and dangerous areas(PRDs),by creating agrid environment.And finally the objective function was solved by means of an adaptive ant colony algorithm(AACA).The A593,A470,B221,and G204 air routes in the busy ZSHA flight information region,where the airspace includes areas with different levels of PRDs,were taken as an example.Based on current flight patterns,a layout optimization of the ARNN was computed using this model and algorithm and successfully avoided PRDs.The optimized result reduced the total length of routes by 2.14% and the total cost by 9.875%.展开更多
Sampling-based path planning is a popular methodology for robot path planning.With a uniform sampling strategy to explore the state space,a feasible path can be found without the complex geometric modeling of the conf...Sampling-based path planning is a popular methodology for robot path planning.With a uniform sampling strategy to explore the state space,a feasible path can be found without the complex geometric modeling of the configuration space.However,the quality of the initial solution is not guaranteed,and the convergence speed to the optimal solution is slow.In this paper,we present a novel image-based path planning algorithm to overcome these limitations.Specifically,a generative adversarial network(GAN)is designed to take the environment map(denoted as RGB image)as the input without other preprocessing works.The output is also an RGB image where the promising region(where a feasible path probably exists)is segmented.This promising region is utilized as a heuristic to achieve non-uniform sampling for the path planner.We conduct a number of simulation experiments to validate the effectiveness of the proposed method,and the results demonstrate that our method performs much better in terms of the quality of the initial solution and the convergence speed to the optimal solution.Furthermore,apart from the environments similar to the training set,our method also works well on the environments which are very different from the training set.展开更多
Rural power network planning is a complicated nonlinear optimized combination problem which based on load forecasting results, and its actual load is affected by many uncertain factors, which influenced optimization r...Rural power network planning is a complicated nonlinear optimized combination problem which based on load forecasting results, and its actual load is affected by many uncertain factors, which influenced optimization results of rural power network planning. To solve the problems, the interval algorithm was used to modify the initial search method of uncertainty load mathematics model in rural network planning. Meanwhile, the genetic/tabu search combination algorithm was adopted to optimize the initialized network. The sample analysis results showed that compared with the certainty planning, the improved method was suitable for urban medium-voltage distribution network planning with consideration of uncertainty load and the planning results conformed to the reality.展开更多
This paper proposes to use the power system simulation software CYME to plan, model and simulate for an actual distribution network for improving the reliability and efficiency, enhancing the efficiency and capacity, ...This paper proposes to use the power system simulation software CYME to plan, model and simulate for an actual distribution network for improving the reliability and efficiency, enhancing the efficiency and capacity, simulating the abnormal condition of distribution network, and presenting operation program of safe, reliable and having simulation record statements. The modeling simulation results show that the software module has lots of advantages including high accuracy, ideal reliability, powerful practicality in simulation and analysis of distribution network, it only need to create once model, the model can sufficiently satisfy multifarious types of simulation analysis required for the distribution network planning.展开更多
CDMA network planning, for example in 3G UMTS networks, is an important task whether for upgrading existing networks or planning new networks. It is a time consuming, computationally hard, task and generally requires ...CDMA network planning, for example in 3G UMTS networks, is an important task whether for upgrading existing networks or planning new networks. It is a time consuming, computationally hard, task and generally requires the consideration of both downlink and uplink requirements. Simulation experiments presented here suggest that if time is a major consideration in the planning process then as a compromise only uplink needs to be considered.展开更多
Recently,the path planning problem may be considered one of the most interesting researched topics in autonomous robotics.That is why finding a safe path in a cluttered environment for a mobile robot is a significant ...Recently,the path planning problem may be considered one of the most interesting researched topics in autonomous robotics.That is why finding a safe path in a cluttered environment for a mobile robot is a significant requisite.A promising route planning for mobile robots on one side saves time and,on the other side,reduces the wear and tear on the robot,saving the capital investment.Numerous route planning methods for the mobile robot have been developed and applied.According to our best knowledge,no method offers an optimum solution among the existing methods.Particle Swarm Optimization(PSO),a numerical optimization method based on the mobility of virtual particles in a multidimensional space,is considered one of the best algorithms for route planning under constantly changing environmental circumstances.Among the researchers,reactive methods are increasingly common and extensively used for the training of neural networks in order to have efficient route planning for mobile robots.This paper proposes a PSO Weighted Grey Wolf Optimization(PSOWGWO)algorithm.PSOWGWO is a hybrid algorithm based on enhanced Grey Wolf Optimization(GWO)with weights.In order to measure the statistical efficiency of the proposed algorithm,Wilcoxon rank-sum and ANOVA statistical tests are applied.The experimental results demonstrate a 25%to 45%enhancement in terms of Area Under Curve(AUC).Moreover,superior performance in terms of data size,path planning time,and accuracy is demonstrated over other state-of-the-art techniques.展开更多
As new generation mobile networks, 3G networks focus on data services and integrate voice, data and multimedia services. However, traditional Optical Transport Networks (OTNs) cannot meet the requirements of 3G networ...As new generation mobile networks, 3G networks focus on data services and integrate voice, data and multimedia services. However, traditional Optical Transport Networks (OTNs) cannot meet the requirements of 3G networks anymore, because of their complicated configuration, low bandwidth efficiency, high cost, and bad network and service scalability. The emerging of Multi-Service Transport Platform (MSTP), Wavelength Division Multiplexing (WDM), and Automatically Switched Optical Network (ASON) technologies for optical fiber communications makes up for these weaknesses. The leading solution to 3G access transport networks is the MSTP technology based on Synchronous Digital Hierarchy (SDH), while that to 3G core transport network is ASON+WDM.展开更多
This study investigated a water supply recovery problem involving municipal water service piping. The problem consisted in recovering full service after network failure, in order to rapidly satisfy all urgent citywide...This study investigated a water supply recovery problem involving municipal water service piping. The problem consisted in recovering full service after network failure, in order to rapidly satisfy all urgent citywide demands. The optimal recovery solution was achieved through the application of so-called network design problems (NDPs), which are a form of combinatorial optimization problem. However, a conventional NDP is not suitable for addressing urgent situations because (1) it does not utilize the non-failure arcs in the network, and (2) it is solely concerned with stable costs such as flow costs. Therefore, to adapt the technique to such urgent situations, the conventional NDP is here modified to deal with the specified water supply problem. In addition, a numerical illustration using the Sendai water network is presented.展开更多
基金Projects(70373017 70572090) supported by the National Natural Science Foundation of China
文摘Transmission network planning (TNP) is a large-scale, complex, with more non-linear discrete variables and the multi-objective constrained optimization problem. In the optimization process, the line investment, network reliability and the network loss are the main objective of transmission network planning. Combined with set pair analysis (SPA), particle swarm optimization (PSO), neural network (NN), a hybrid particle swarm optimization model was established with neural network and set pair analysis for transmission network planning (HPNS). Firstly, the contact degree of set pair analysis was introduced, the traditional goal set was converted into the collection of the three indicators including the identity degree, difference agree and contrary degree. On this bases, using shi(H), the three objective optimization problem was converted into single objective optimization problem. Secondly, using the fast and efficient search capabilities of PSO, the transmission network planning model based on set pair analysis was optimized. In the process of optimization, by improving the BP neural network constantly training so that the value of the fitness function of PSO becomes smaller in order to obtain the optimization program fitting the three objectives better. Finally, compared HPNS with PSO algorithm and the classic genetic algorithm, HPNS increased about 23% efficiency than THA, raised about 3.7% than PSO and improved about 2.96% than GA.
基金This work was fully supported by U Nyi Hla Nge Foundation at Yangon Technological University,Gyogone,Insein PO,11011,Yangon,Myanmar。
文摘The paper mainly focuses on the network planning and optimization problem in the 5G telecommunication system based on the numerical investigation.There have been two portions of this work,such as network planning for efficient network models and optimization of power allocation in the 5G network.The radio network planning process has been completed based on a specific area.The data rate requirement can be solved by allowing the densification of the system by deploying small cells.The radio network planning scheme is the indispensable platform in arranging a wireless network that encounters convinced coverage method,capacity,and Quality of Service necessities.In this study,the eighty micro base stations and two-hundred mobile stations are deployed in the-15km×15km wide selected area in the Yangon downtown area.The optimization processes were also analyzed based on the source and destination nodes in the 5G network.The base stations’location is minimized and optimized in a selected geographical area with the linear programming technique and analyzed in this study.
基金Supported by National Natural Science Foundation of China (50177017)Important science and technology research project of Shanghai China (041612012)National Power Grid Company subsidized Research SGZL[2004]151.
文摘The author introduced particle swarm optimization as a new method for power transmission network expansion planning. A new discrete method for particle swarm optimization was developed,which is suitable for power transmission network expansion planning, and requires less computer s memory.The optimization fitness function construction, parameter selection, convergence judgement, and their characters were analyzod.Numerical simulation demonstrated the effectiveness and correctness or the method. This paper provides an academic and practical basis of particle swarm optimization in application of transmission network expansion planning for further investigation.
文摘A distribution network plays an extremely important role in the safe and efficient operation of a power grid.As the core part of a power grid’s operation,a distribution network will have a significant impact on the safety and reliability of residential electricity consumption.it is necessary to actively plan and modify the distribution network’s structure in the power grid,improve the quality of the distribution network,and optimize the planning of the distribution network,so that the network can be fully utilized to meet the needs of electricity consumption.In this paper,a distribution network grid planning algorithm based on the reliability of electricity consumption was completed using ant colony algorithm.For the distribution network structure planning of dual power sources,the parallel ant colony algorithm was used to prove that the premise of parallelism is the interactive process of ant colonies,and the dual power distribution network structure model is established based on the principle of the lowest cost.The artificial ants in the algorithm were compared with real ants in nature,and the basic steps and working principle of the ant colony optimization algorithm was studied with the help of the travelling salesman problem(TSP).Then,the limitations of the ant colony algorithm were analyzed,and an improvement strategy was proposed by using python for digital simulation.The results demonstrated the reliability of model-building and algorithm improvement.
基金supported by the the Youth Science and Technology Innovation Fund (Science)(Nos.NS2014070, NS2014070)
文摘Air route network(ARN)planning is an efficient way to alleviate civil aviation flight delays caused by increasing development and pressure for safe operation.Here,the ARN shortest path was taken as the objective function,and an air route network node(ARNN)optimization model was developed to circumvent the restrictions imposed by″three areas″,also known as prohibited areas,restricted areas,and dangerous areas(PRDs),by creating agrid environment.And finally the objective function was solved by means of an adaptive ant colony algorithm(AACA).The A593,A470,B221,and G204 air routes in the busy ZSHA flight information region,where the airspace includes areas with different levels of PRDs,were taken as an example.Based on current flight patterns,a layout optimization of the ARNN was computed using this model and algorithm and successfully avoided PRDs.The optimized result reduced the total length of routes by 2.14% and the total cost by 9.875%.
基金This work was partially supported by National Key R&D Program of China(2019YFB1312400)Shenzhen Key Laboratory of Robotics Perception and Intelligence(ZDSYS20200810171800001)+1 种基金Hong Kong RGC GRF(14200618)Hong Kong RGC CRF(C4063-18G).
文摘Sampling-based path planning is a popular methodology for robot path planning.With a uniform sampling strategy to explore the state space,a feasible path can be found without the complex geometric modeling of the configuration space.However,the quality of the initial solution is not guaranteed,and the convergence speed to the optimal solution is slow.In this paper,we present a novel image-based path planning algorithm to overcome these limitations.Specifically,a generative adversarial network(GAN)is designed to take the environment map(denoted as RGB image)as the input without other preprocessing works.The output is also an RGB image where the promising region(where a feasible path probably exists)is segmented.This promising region is utilized as a heuristic to achieve non-uniform sampling for the path planner.We conduct a number of simulation experiments to validate the effectiveness of the proposed method,and the results demonstrate that our method performs much better in terms of the quality of the initial solution and the convergence speed to the optimal solution.Furthermore,apart from the environments similar to the training set,our method also works well on the environments which are very different from the training set.
文摘Rural power network planning is a complicated nonlinear optimized combination problem which based on load forecasting results, and its actual load is affected by many uncertain factors, which influenced optimization results of rural power network planning. To solve the problems, the interval algorithm was used to modify the initial search method of uncertainty load mathematics model in rural network planning. Meanwhile, the genetic/tabu search combination algorithm was adopted to optimize the initialized network. The sample analysis results showed that compared with the certainty planning, the improved method was suitable for urban medium-voltage distribution network planning with consideration of uncertainty load and the planning results conformed to the reality.
文摘This paper proposes to use the power system simulation software CYME to plan, model and simulate for an actual distribution network for improving the reliability and efficiency, enhancing the efficiency and capacity, simulating the abnormal condition of distribution network, and presenting operation program of safe, reliable and having simulation record statements. The modeling simulation results show that the software module has lots of advantages including high accuracy, ideal reliability, powerful practicality in simulation and analysis of distribution network, it only need to create once model, the model can sufficiently satisfy multifarious types of simulation analysis required for the distribution network planning.
文摘CDMA network planning, for example in 3G UMTS networks, is an important task whether for upgrading existing networks or planning new networks. It is a time consuming, computationally hard, task and generally requires the consideration of both downlink and uplink requirements. Simulation experiments presented here suggest that if time is a major consideration in the planning process then as a compromise only uplink needs to be considered.
文摘Recently,the path planning problem may be considered one of the most interesting researched topics in autonomous robotics.That is why finding a safe path in a cluttered environment for a mobile robot is a significant requisite.A promising route planning for mobile robots on one side saves time and,on the other side,reduces the wear and tear on the robot,saving the capital investment.Numerous route planning methods for the mobile robot have been developed and applied.According to our best knowledge,no method offers an optimum solution among the existing methods.Particle Swarm Optimization(PSO),a numerical optimization method based on the mobility of virtual particles in a multidimensional space,is considered one of the best algorithms for route planning under constantly changing environmental circumstances.Among the researchers,reactive methods are increasingly common and extensively used for the training of neural networks in order to have efficient route planning for mobile robots.This paper proposes a PSO Weighted Grey Wolf Optimization(PSOWGWO)algorithm.PSOWGWO is a hybrid algorithm based on enhanced Grey Wolf Optimization(GWO)with weights.In order to measure the statistical efficiency of the proposed algorithm,Wilcoxon rank-sum and ANOVA statistical tests are applied.The experimental results demonstrate a 25%to 45%enhancement in terms of Area Under Curve(AUC).Moreover,superior performance in terms of data size,path planning time,and accuracy is demonstrated over other state-of-the-art techniques.
文摘As new generation mobile networks, 3G networks focus on data services and integrate voice, data and multimedia services. However, traditional Optical Transport Networks (OTNs) cannot meet the requirements of 3G networks anymore, because of their complicated configuration, low bandwidth efficiency, high cost, and bad network and service scalability. The emerging of Multi-Service Transport Platform (MSTP), Wavelength Division Multiplexing (WDM), and Automatically Switched Optical Network (ASON) technologies for optical fiber communications makes up for these weaknesses. The leading solution to 3G access transport networks is the MSTP technology based on Synchronous Digital Hierarchy (SDH), while that to 3G core transport network is ASON+WDM.
文摘This study investigated a water supply recovery problem involving municipal water service piping. The problem consisted in recovering full service after network failure, in order to rapidly satisfy all urgent citywide demands. The optimal recovery solution was achieved through the application of so-called network design problems (NDPs), which are a form of combinatorial optimization problem. However, a conventional NDP is not suitable for addressing urgent situations because (1) it does not utilize the non-failure arcs in the network, and (2) it is solely concerned with stable costs such as flow costs. Therefore, to adapt the technique to such urgent situations, the conventional NDP is here modified to deal with the specified water supply problem. In addition, a numerical illustration using the Sendai water network is presented.