期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Reconfiguration and Optimal Positioning of Multiple-Point Capacitors in a High-Voltage Distribution Network Using the NSGAII
1
作者 Arouna Oloulade Richard Gilles Agbokpanzo +6 位作者 Maurel Richy Aza-Gnandji Hassane Ousseyni Ibrahim Moussa Gonda Eméric Tokoudagba Juliano Sétondji François-Xavier Fifatin Adolphe Moukengue Imano 《Open Journal of Applied Sciences》 2025年第2期501-516,共16页
The distribution networks sometimes suffer from excessive losses and voltage violations in densely populated areas. The aim of the present study is to improve the performance of a distribution network by successively ... The distribution networks sometimes suffer from excessive losses and voltage violations in densely populated areas. The aim of the present study is to improve the performance of a distribution network by successively applying mono-capacitor positioning, multiple positioning and reconfiguration processes using GA-based algorithms implemented in a Matlab environment. From the diagnostic study of this network, it was observed that a minimum voltage of 0.90 pu induces a voltage deviation of 5.26%, followed by active and reactive losses of 425.08 kW and 435.09 kVAR, respectively. Single placement with the NSGAII resulted in the placement of a 3000 kVAR capacitor at node 128, which proved to be the invariably neuralgic point. Multiple placements resulted in a 21.55% reduction in losses and a 0.74% regression in voltage profile performance. After topology optimization, the loss profile improved by 65.08% and the voltage profile improved by 1.05%. Genetic algorithms are efficient and effective tools for improving the performance of distribution networks, whose degradation is often dynamic due to the natural variability of loads. 展开更多
关键词 RECONFIGURATION Capacitor Bank NSGA II Dynamic network Degradation distribution network reliability
在线阅读 下载PDF
Problems and Solutions for Medium-Voltage Distribution Network in Nanning City
2
作者 晏家进 《Electricity》 2000年第4期44-48,共5页
This paper introduces the problems emerged in the developing process of Nanning Medium-voltage distribution network to adapt the progress of HV network. These problems are: (1) unreasonable structure (large amount of ... This paper introduces the problems emerged in the developing process of Nanning Medium-voltage distribution network to adapt the progress of HV network. These problems are: (1) unreasonable structure (large amount of radical type 10 kV lines); (2) one 10 kV line for each customer (causing difficulties for line corridors); (3) circuit breaker are widely used for MV customers (result in complicated substation structure); (4) lots of overhead 10 kV lines in urban area. Ring circuit, insulated cables, load break switches, and fast acting fuses etc. advanced technologies are proposed for the retrofit of urban distribution network. 展开更多
关键词 power distribution network reliability ring distribution network
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部