A flexible sidetracking stimulation technology of horizontal wells is formed to develop the lateral deep remaining oil and gas resources of the low-permeability mature oilfields.This technology first uses the flexible...A flexible sidetracking stimulation technology of horizontal wells is formed to develop the lateral deep remaining oil and gas resources of the low-permeability mature oilfields.This technology first uses the flexible sidetracking tool to achieve low-cost sidetracking in the old wellbore,and then uses the hydraulic jet technology to induce multiple fractures to fracture.Finally,the bullhead fracturing of multi-cluster temporary plugging for the sidetracking hole is carried out by running the tubing string,to realize the efficient development of the remaining reserves among the wells.The flexible sidetracking stimulation technology involves flexible sidetracking horizontal wells drilling and sidetracking horizontal well fracturing.The flexible sidetracking horizontal well drilling includes three aspects:flexible drill pipe structure and material optimization,drilling technology,and sealed coring tool.The sidetracking horizontal well fracturing includes two aspects:fracturing scheme optimization,fracturing tools and implementation process optimization.The technology has been conducted several rounds of field tests in the Ansai Oilfield of Changqing,China.The results show that by changing well type and reducing row spacing of oil and water wells,the pressure displacement system can be well established to achieve effective pressure transmission and to achieve the purpose of increasing liquid production in low-yield and low-efficiency wells.It is verified that the flexible sidetracking stimulation technology can provide favorable support for accurately developing remaining reserves in low-permeability reservoirs.展开更多
To seek effective ways of lowering development cost and tapping inter-well remaining reserves, sidetracking horizontal wells from old wells in Su10 and Su53 Block were conducted. The engineering and geological problem...To seek effective ways of lowering development cost and tapping inter-well remaining reserves, sidetracking horizontal wells from old wells in Su10 and Su53 Block were conducted. The engineering and geological problems such as leakage, collapse and sticking in slim-hole sidetracking, and difficult evaluation of remaining gas were gradually overcome, and a set of drilling and completion technology, well deployment optimization technology and geo-steering technology suitable for sidetracking horizontal wells in tight sandstone gas reservoirs have been worked out. By making full use of the old well, sidetracking horizontal wells can greatly reduce development costs, enhance the producing degree of inter-well remaining reserves, and get production 3-5 times of that of adjacent vertical wells.Its production effect is influenced by encountered sandstone length, the position of the horizontal segment in the reservoir, produced effective reservoir thickness, gas saturation, controlled reserves and fracturing effect, etc. Up to now, in Block Su10 and Su53, 12 sidetracking horizontal wells have been drilled, which have an average drilling cycle of 49 days, average horizontal section length of 689 m,average effective drilling ratio of 61.5%, average well-head pressure of 16.2 MPa, and daily output of 4.7×10~4 m^3 at the initial stage after production. By the end of 2017, the average yield increment was more than 1 000×10~4 m^3 with good effect. With the increase of low yield old wells, wells in the enrichment regions tend to be saturated and the rest gas-bearing areas are lower in grade, therefore, sidetracking horizontal well can be used for optimization of well pattern, well deployment mode and exploitation of remaining oil areas.展开更多
The oil reservoir depth that can be reached by drilling shallow horizontal wells with ordinary drilling tools is usually 500-1500m, showing good reservoir properties and faster drilling speed. Under the influence of g...The oil reservoir depth that can be reached by drilling shallow horizontal wells with ordinary drilling tools is usually 500-1500m, showing good reservoir properties and faster drilling speed. Under the influence of geological change factors, horizontal wells will have to change their geological design in the actual drilling process because they cannot achieve the expected purpose of the oil layer. Accordingly, a series of complicated situations will also occur in the drilling process. The solution at this stage is to choose to inject cement to fill the well and re-drill, but the construction period of injecting cement is longer and the drilling cost is higher. In view of this, the suspended sidetracking technology is generally selected to realize shallow horizontal well drilling, which has higher efficiency and lower cost.展开更多
Organic rich dark shale of Q Formation can be found in many areas(e.g.,in the North of S Basin).The shale target stratum is easy to hydrate and often undergoes spallation.Therefore,centering the casing in the horizont...Organic rich dark shale of Q Formation can be found in many areas(e.g.,in the North of S Basin).The shale target stratum is easy to hydrate and often undergoes spallation.Therefore,centering the casing in the horizontal section of the irregular borehole is relatively difficult.Similarly,achieving a good cementflushing efficiency under complex borehole conditions is a complex task.Through technologies such as centralizer,efficient preflushing,multi-stageflushing and ductile cement slurry,better performances can be achieved.In this study,it is shown that the cementing rate in the DY2H horizontal section is 97.8%,which is more than 34%higher than that of adjacent wells.This cementing matching technology for sidetracking horizontal wells can be used to improve the cementing quality of continental shale and provides a reference for future applications in thisfield.展开更多
The scaling criteria of physical modeling of a horizontal well production are discussed. A scaled experimental model was designed and realized. The experiments of a sidetrack horizontal well production have been carri...The scaling criteria of physical modeling of a horizontal well production are discussed. A scaled experimental model was designed and realized. The experiments of a sidetrack horizontal well production have been carried out in the system, and the production curve variation is analyzed. The oil recovery of a sidetrack horizontal well production is compared with that of a vertical well, and the effect of factors such as sidetrack drilling time, water driving rate and the length of horizontal section on oil recovery are discussed. The production of a horizontal well changed both the fluid flow direction and pressure distribution in the reservoir; as a result the remaining oil in the dead oil region is recovered, and the ultimate oil output is raised.展开更多
基金Supported by the National Key Research and Development Program of China(2023YFF0615403)CNPC Science and Technology Project(2023ZZ0803).
文摘A flexible sidetracking stimulation technology of horizontal wells is formed to develop the lateral deep remaining oil and gas resources of the low-permeability mature oilfields.This technology first uses the flexible sidetracking tool to achieve low-cost sidetracking in the old wellbore,and then uses the hydraulic jet technology to induce multiple fractures to fracture.Finally,the bullhead fracturing of multi-cluster temporary plugging for the sidetracking hole is carried out by running the tubing string,to realize the efficient development of the remaining reserves among the wells.The flexible sidetracking stimulation technology involves flexible sidetracking horizontal wells drilling and sidetracking horizontal well fracturing.The flexible sidetracking horizontal well drilling includes three aspects:flexible drill pipe structure and material optimization,drilling technology,and sealed coring tool.The sidetracking horizontal well fracturing includes two aspects:fracturing scheme optimization,fracturing tools and implementation process optimization.The technology has been conducted several rounds of field tests in the Ansai Oilfield of Changqing,China.The results show that by changing well type and reducing row spacing of oil and water wells,the pressure displacement system can be well established to achieve effective pressure transmission and to achieve the purpose of increasing liquid production in low-yield and low-efficiency wells.It is verified that the flexible sidetracking stimulation technology can provide favorable support for accurately developing remaining reserves in low-permeability reservoirs.
基金Supported by the Project of Great Wall Drilling Company in CNPC(2015A25-2(2012))
文摘To seek effective ways of lowering development cost and tapping inter-well remaining reserves, sidetracking horizontal wells from old wells in Su10 and Su53 Block were conducted. The engineering and geological problems such as leakage, collapse and sticking in slim-hole sidetracking, and difficult evaluation of remaining gas were gradually overcome, and a set of drilling and completion technology, well deployment optimization technology and geo-steering technology suitable for sidetracking horizontal wells in tight sandstone gas reservoirs have been worked out. By making full use of the old well, sidetracking horizontal wells can greatly reduce development costs, enhance the producing degree of inter-well remaining reserves, and get production 3-5 times of that of adjacent vertical wells.Its production effect is influenced by encountered sandstone length, the position of the horizontal segment in the reservoir, produced effective reservoir thickness, gas saturation, controlled reserves and fracturing effect, etc. Up to now, in Block Su10 and Su53, 12 sidetracking horizontal wells have been drilled, which have an average drilling cycle of 49 days, average horizontal section length of 689 m,average effective drilling ratio of 61.5%, average well-head pressure of 16.2 MPa, and daily output of 4.7×10~4 m^3 at the initial stage after production. By the end of 2017, the average yield increment was more than 1 000×10~4 m^3 with good effect. With the increase of low yield old wells, wells in the enrichment regions tend to be saturated and the rest gas-bearing areas are lower in grade, therefore, sidetracking horizontal well can be used for optimization of well pattern, well deployment mode and exploitation of remaining oil areas.
文摘The oil reservoir depth that can be reached by drilling shallow horizontal wells with ordinary drilling tools is usually 500-1500m, showing good reservoir properties and faster drilling speed. Under the influence of geological change factors, horizontal wells will have to change their geological design in the actual drilling process because they cannot achieve the expected purpose of the oil layer. Accordingly, a series of complicated situations will also occur in the drilling process. The solution at this stage is to choose to inject cement to fill the well and re-drill, but the construction period of injecting cement is longer and the drilling cost is higher. In view of this, the suspended sidetracking technology is generally selected to realize shallow horizontal well drilling, which has higher efficiency and lower cost.
基金funded by the CNPC Science and Technology Department Project(2021ZZ10-03)。
文摘Organic rich dark shale of Q Formation can be found in many areas(e.g.,in the North of S Basin).The shale target stratum is easy to hydrate and often undergoes spallation.Therefore,centering the casing in the horizontal section of the irregular borehole is relatively difficult.Similarly,achieving a good cementflushing efficiency under complex borehole conditions is a complex task.Through technologies such as centralizer,efficient preflushing,multi-stageflushing and ductile cement slurry,better performances can be achieved.In this study,it is shown that the cementing rate in the DY2H horizontal section is 97.8%,which is more than 34%higher than that of adjacent wells.This cementing matching technology for sidetracking horizontal wells can be used to improve the cementing quality of continental shale and provides a reference for future applications in thisfield.
基金This work is part of results of National Key Science and Technology Research Projects from 1995 to 2000 (Grant number 95-108-01-02).
文摘The scaling criteria of physical modeling of a horizontal well production are discussed. A scaled experimental model was designed and realized. The experiments of a sidetrack horizontal well production have been carried out in the system, and the production curve variation is analyzed. The oil recovery of a sidetrack horizontal well production is compared with that of a vertical well, and the effect of factors such as sidetrack drilling time, water driving rate and the length of horizontal section on oil recovery are discussed. The production of a horizontal well changed both the fluid flow direction and pressure distribution in the reservoir; as a result the remaining oil in the dead oil region is recovered, and the ultimate oil output is raised.