Tunnel construction is susceptible to accidents such as loosening, deformation, collapse, and water inrush, especiallyunder complex geological conditions like dense fault areas. These accidents can cause instability a...Tunnel construction is susceptible to accidents such as loosening, deformation, collapse, and water inrush, especiallyunder complex geological conditions like dense fault areas. These accidents can cause instability and damageto the tunnel. As a result, it is essential to conduct research on tunnel construction and grouting reinforcementtechnology in fault fracture zones to address these issues and ensure the safety of tunnel excavation projects. Thisstudy utilized the Xianglushan cross-fault tunnel to conduct a comprehensive analysis on the construction, support,and reinforcement of a tunnel crossing a fault fracture zone using the three-dimensional finite element numericalmethod. The study yielded the following research conclusions: The excavation conditions of the cross-fault tunnelarray were analyzed to determine the optimal construction method for excavation while controlling deformationand stress in the surrounding rock. The middle partition method (CD method) was found to be the most suitable.Additionally, the effects of advanced reinforcement grouting on the cross-fault fracture zone tunnel were studied,and the optimal combination of grouting reinforcement range (140°) and grouting thickness (1m) was determined.The stress and deformation data obtained fromon-site monitoring of the surrounding rock was slightly lower thanthe numerical simulation results. However, the change trend of both sets of data was found to be consistent. Theseresearch findings provide technical analysis and data support for the construction and design of cross-fault tunnels.展开更多
Engineering shallow,large-span rock tunnels challenges deformation control and escalates construction costs.This study investigates the excavation compensation method(ECM)and its associated technologies to address the...Engineering shallow,large-span rock tunnels challenges deformation control and escalates construction costs.This study investigates the excavation compensation method(ECM)and its associated technologies to address these issues.Utilizing five key technologies,the ECM effectively modulates radial stress post-excavation,redistributes stress in the surrounding rock,and eliminates tensile stress at the excavation face.Pre-tensioning measures further enhance the rock’s residual strength,establishing a new stability equilibrium.Field tests corroborate the method’s effectiveness,demonstrating a crown settlement reduction of 3–8 mm,a nearly 50%decrease compared to conventional construction approaches.Additionally,material consumption and construction duration were reduced by approximately 30%–35%and 1.75 months per 100 m,respectively.Thus,the ECM represents a significant innovation in enhancing the stability and construction efficiency of large-span rock tunnels,marking a novel contribution to the engineering field.展开更多
Due to the long-term plate tectonic movements in southwestern China,the in-situ stress field in deep formations is complex.When passing through deep soft-rock mass under non-hydrostatic high in-situ stress field,tunne...Due to the long-term plate tectonic movements in southwestern China,the in-situ stress field in deep formations is complex.When passing through deep soft-rock mass under non-hydrostatic high in-situ stress field,tunnels will suffer serious asymmetric deformation.There is no available support design method for tunnels under such a situation in existing studies to clarify the support time and support stiffness.This study first analyzed the mechanical behavior of tunnels in non-hydrostatic in-situ stress field and derived the theoretical equations of the ground squeezing curve(GSC)and ground loosening curve(GLC).Then,based on the convergence confinement theory,the support design method of deep soft-rock tunnels under non-hydrostatic high in-situ stress field was established considering both squeezing and loosening pressures.In addition,this method can provide the clear support time and support stiffness of the second layer of initial support.The proposed design method was applied to the Wanhe tunnel of the China-Laos railway in China.Monitoring data indicated that the optimal support scheme had a good effect on controlling the tunnel deformation in non-hydrostatic high in-situ stress field.Field applications showed that the secondary lining could be constructed properly.展开更多
The stratum lithology and geological structure of the highway tunnel in the mountainous areas of western China are complex,and the engineering geological conditions are complicated.When the highway tunnel passes throu...The stratum lithology and geological structure of the highway tunnel in the mountainous areas of western China are complex,and the engineering geological conditions are complicated.When the highway tunnel passes through different lithological strata,its structural design and construction technology are completely diff erent.Therefore,in order to support the tunnel design and construction,the tunnel survey Among them,the identifi cation of the contact boundary between magmatic rock and metamorphic rock and the grade of surrounding rock is very important.Through magnetotelluric survey of the Mupi tunnel of Jiuzhaigou-Mianyang highway on G8513 line,2D forward numerical simulation,1D,2D,3D inversion,and engineering geological analysis,it is revealed that the electrical characteristics of each layer,focusing on the identifi cation of the contact boundary between magmatic rock and metamorphic rock.This study provides the electrical characteristics of the magmatic rock and metamorphic rock contact boundary of the Mupi Tunnel.It is speculated that the boundary is revealed by the tunnel construction excavation,which verifies the correctness of the geophysical inversion model and provides a more detailed design basis for the tunnel design.I believe that taking the Mupi Tunnel survey as an example,through this research,it can provide detailed geophysical evidence for highway tunnels to distinguish between magmatic rock and metamorphic rock.展开更多
In recent years,the mine tunneling method and the new Austrian tunneling method have been considered the main theories of tunneling approaches in China.It is difficult for the traditional technique to overcome the lar...In recent years,the mine tunneling method and the new Austrian tunneling method have been considered the main theories of tunneling approaches in China.It is difficult for the traditional technique to overcome the large deformation problems imposed by complex geological conditions of mountain soft rock tunneling.Hence,the compensation excavation method has been proposed to solve this issue under the consideration that all damage in tunneling originates from the excavation.It uses supportive strategies to counteract the excavation effects successfully.This paper provides an overview of the fundamental ideas of the compensation excavation method,methodologies,and field applications.The scientific validity and feasibility of the compensation excavation method were investigated through the practical engineering study of the Muzhailing and Changning tunnels.展开更多
Accurate seismic assessment and proper aseismic design of underground structures require a comprehensive understanding of seismic performance and response of underground structures under earthquake force.In order to u...Accurate seismic assessment and proper aseismic design of underground structures require a comprehensive understanding of seismic performance and response of underground structures under earthquake force.In order to understand the seismic behavior of tunnels during an earthquake,a wide collection of case histories has been reviewed from the available literature with respect to damage classification,to discuss the possible causes of damage,such as earthquake parameters,structural form and geological conditions.In addition,a case of Tawarayama tunnel subjected to the 2016 Kumamoto earthquake is studied.Discussion on the possible influence factors aims at improving the performancebased aseismic design of tunnels.Finally,restoration design criterion and methods are presented taking Tawarayama tunnel as an example.展开更多
Rockbursting in deep tunnelling is a complex phenomenon posing significant challenges both at the design and construction stages of an underground excavation within hard rock masses and under high in situ stresses. Wh...Rockbursting in deep tunnelling is a complex phenomenon posing significant challenges both at the design and construction stages of an underground excavation within hard rock masses and under high in situ stresses. While local experience, field monitoring, and informed data-rich analysis are some of the tools commonly used to manage the hazards and the associated risks, advanced numerical techniques based on discontinuum modelling have also shown potential in assisting in the assessment of rockbursting. In this study, the hybrid finite-discrete element method(FDEM) is employed to investigate the failure and fracturing processes, and the mechanisms of energy storage and rapid release resulting in bursting, as well as to assess its utility as part of the design process of underground excavations.Following the calibration of the numerical model to simulate a deep excavation in a hard, massive rock mass, discrete fracture network(DFN) geometries are integrated into the model in order to examine the impact of rock structure on rockbursting under high in situ stresses. The obtained analysis results not only highlight the importance of explicitly simulating pre-existing joints within the model, as they affect the mobilised failure mechanisms and the intensity of strain bursting phenomena, but also show how the employed joint network geometry, the field stress conditions, and their interaction influence the extent and depth of the excavation induced damage. Furthermore, a rigorous analysis of the mass and velocity of the ejected rock blocks and comparison of the obtained data with well-established semi-empirical approaches demonstrate the potential of the method to provide realistic estimates of the kinetic energy released during bursting for determining the energy support demand.展开更多
Recent developments in tunneling have stimulated design practitioners to more effectively utilize the underground spaces.However,tunneling at shallow depth in soft grounds gives rise to concerns associated with tunnel...Recent developments in tunneling have stimulated design practitioners to more effectively utilize the underground spaces.However,tunneling at shallow depth in soft grounds gives rise to concerns associated with tunnel instability.Umbrella arch method(UAM),as a pre-reinforcement approach of tunnels in complex geological conditions,is widely used to maintain the tunnel stability.Quantitative assessment of the impacts of the entire approach and forepoling pipe features on tunnel stability remains challenging due to the complex nature of the UAM application.This study aimed to assess the effect of pipe design parameters on reinforcing the tunnels excavated in soft grounds.This practical investigation considered the actual field conditions attributed to the tunneling procedure and UAM deployment.Then,the tunneling process was modeled and the tunnel excavation-induced settlements were calculated.The post-processed results confirmed that deploying the UAM substantially reduced the tunnel crown and ground surface settlements by 76%and 42%,respectively.Investigation of various design parameters of pipes underscored the significance of incorporating the optimum value for each individual parameter into design schemes to more effectively control the settlements.Additionally,contrasting the settlement reduction rates(SRRs)for pipe design variables showed that the tunnel stability is more sensitive to the changes in the values of diameter and length,compared to values of the installation angle and center-tocenter distance of the pipes.展开更多
For deep tunnel projects,selecting an appropriate initial support distance is critical to improving the self-supporting capacity of surrounding rock.In this work,an intuitive method for determining the tunnel’s initi...For deep tunnel projects,selecting an appropriate initial support distance is critical to improving the self-supporting capacity of surrounding rock.In this work,an intuitive method for determining the tunnel’s initial support distance was proposed.First,based on the convergence-confinement method,a three-dimensional analytical model was constructed by combining an analytical solution of a non-circular tunnel with the Tecplot software.Then,according to the integral failure criteria of rock,the failure tendency coefficients of hard surrounding rock were computed and the spatial distribution plots of that were constructed.On this basis,the tunnel’s key failure positions were identified,and the relationship between the failure tendency coefficient at key failure positions and their distances from the working face was established.Finally,the distance from the working face that corresponds to the critical failure tendency coefficient was taken as the optimal support distance.A practical project was used as an example,and a reasonable initial support distance was successfully determined by applying the developed method.Moreover,it is found that the stability of hard surrounding rock decreases rapidly within the range of 1.0D(D is the tunnel diameter)from the working face,and tends to be stable outside the range of 1.0D.展开更多
Constructing a metro station by enlarging shield tunnels combined with a mining/cut-and-cover method provides a new method to solve the contradictions of construction time limits of shield tunnels and stations. As a n...Constructing a metro station by enlarging shield tunnels combined with a mining/cut-and-cover method provides a new method to solve the contradictions of construction time limits of shield tunnels and stations. As a new-style construction method, there are several specific risks involved in the construction process. Based on the test section of Sanyuanqiao station on Beijing metro line 10, and combined with the existing methods of risk identification at present, including a review of world-wide operational experience of similar projects, the study of generic guidance on hazards associated with the type of work being undertaken, and discussions with qualified and experienced staff from the project team, etc., the specific risks during the construction process of the metro station constructed by enlarging shield tunnels combined with the cut-and-cover method are identified. The results show that the specific risks mainly come from three construction processes which include constructing upper enclosure structures, excavating the soil between shield tunnels and demolishing shield segments. Then relevant risk mitigation measures are put forward. The results can provide references for scheme improvement and a comprehensive risk assessment of the new-style construction method.展开更多
Since the development of the new Austrian tunnelling method(NATM)in the 1960s,this technique has been applied successfully in many tunnels.However,opinions of NATM principles emerged till 2000,i.e.NATM is not a tunnel...Since the development of the new Austrian tunnelling method(NATM)in the 1960s,this technique has been applied successfully in many tunnels.However,opinions of NATM principles emerged till 2000,i.e.NATM is not a tunnelling method,but an approach covering all general principles of tunnelling.To investigate the general principles of the NATM,this study focused on tunnelling practises in the Bolu tunnel,and evaluated the conditions under which the NATM practises could be effective.The Bolu tunnel project was designed following the NATM principles.It is evident that practises adopted in this tunnel are important with respect to the NATM.In addition,it shows that the solutions to the problems encountered in this tunnel are consistent with the NATM principles.Finally,the study determines the ground types of the NATM principles and proposes associated updates.展开更多
An estimation approach using least squares method was presented for identificationof model parameters of pressure control in shield tunneling.The state equation ofthe pressure control system for shield tunneling was a...An estimation approach using least squares method was presented for identificationof model parameters of pressure control in shield tunneling.The state equation ofthe pressure control system for shield tunneling was analytically derived based on themass equilibrium principle that the entry mass of the pressure chamber from cutting headwas equal to excluding mass from the screw conveyor.The randomly observed noise wasnumerically simulated and mixed to simulated observation values of system responses.The numerical simulation shows that the state equation of the pressure control system forshield tunneling is reasonable and the proposed estimation approach is effective even ifthe random observation noise exists.The robustness of the controlling procedure is validatedby numerical simulation results.展开更多
In order to investigate the stability problem of shield tunnel faces subjected to seismic loading,the pseudodynamic method(P-DM)was employed to analyze the seismic effect on the face.Two kinds of failure mechanisms of...In order to investigate the stability problem of shield tunnel faces subjected to seismic loading,the pseudodynamic method(P-DM)was employed to analyze the seismic effect on the face.Two kinds of failure mechanisms of active collapse and passive extrusion were considered,and a seismic reliability model of shield tunnel faces under multifailure mode was established.The limit analysis method and the response surface method(RSM)were used together to solve the reliability of shield tunnel faces subjected to seismic action.Comparing with existing results,the results of this work are effective.The effects of seismic load and rock mass strength on the collapse pressure,extrusion pressure and reliability index were discussed,and reasonable ranges of support pressure of shield tunnel faces under seismic action were presented.This method can provide a new idea for solving the shield thrust parameter under the seismic loading.展开更多
For the longitudinal seismic response analysis of a tunnel structure under asynchronous earthquake excitations,a longitudinal integral response deformation method classified as a practical approach is proposed in this...For the longitudinal seismic response analysis of a tunnel structure under asynchronous earthquake excitations,a longitudinal integral response deformation method classified as a practical approach is proposed in this paper.The determinations of the structural critical moments when maximal deformations and internal forces in the longitudinal direction occur are deduced as well.When applying the proposed method,the static analysis of the free-field computation model subjected to the least favorable free-field deformation at the tunnel buried depth is performed first to calculate the equivalent input seismic loads.Then,the equivalent input seismic loads are imposed on the integral tunnel-foundation computation model to conduct the static calculation.Afterwards,the critical longitudinal seismic responses of the tunnel are obtained.The applicability of the new method is verified by comparing the seismic responses of a shield tunnel structure in Beijing,determined by the proposed procedure and by a dynamic time-history analysis under a series of obliquely incident out-of-plane and in-plane waves.The results show that the proposed method has a clear concept with high accuracy and simple progress.Meanwhile,this method provides a feasible way to determine the critical moments of the longitudinal seismic responses of a tunnel structure.Therefore,the proposed method can be effectively applied to analyze the seismic response of a long-line underground structure subjected to non-uniform excitations.展开更多
Tunnels are now an integral part of the infrastructure in major cities around the world. For many reasons, these tunnels have horseshoe-shaped cross-sections with round top and flat bottom. This paper presents some im...Tunnels are now an integral part of the infrastructure in major cities around the world. For many reasons, these tunnels have horseshoe-shaped cross-sections with round top and flat bottom. This paper presents some improvements to the use of the Hyperstatic Reaction Method-HRM for analysing tunnels with horseshoe-shaped cross-sections when these tunnels operate under the influence of earthquakes, particularly in cases when the tunnel lining is a continuous lining. The analysis used parameters of a tunnel from the Hanoi metro system, as well as parameters of the strongest earthquake that may occur in the central Hanoi area in the improved HRM and 2 D numerical methods using the ABAQUS software. On the basis of the results obtained, the paper gives conclusions about the HRM methodology when it is used to calculate tunnels that have horseshoe cross-sections operating under the influence of earthquakes.展开更多
The Freeze-Sealing Pipe-Roof(FSPR)method,which has been applied for the first time in the Gongbei Tunnel of the Hong Kong-Zhuhai-Macao Bridge,is a new approach of tunnel pre-support that allows flexible adjustment of ...The Freeze-Sealing Pipe-Roof(FSPR)method,which has been applied for the first time in the Gongbei Tunnel of the Hong Kong-Zhuhai-Macao Bridge,is a new approach of tunnel pre-support that allows flexible adjustment of freeze tube arrangement and can be adapted to different environmental conditions.When the FSPR method is used to construct shallow burial submerged tunnels,the frozen wall to hold back groundwater during excavation will be weakened by air and water flows inside and outside the tunnel,and its waterproof performance needs to be further investigated.In this paper,a two-dimensional numerical model of the temperature field considering excavation and moving water boundary is established based on the preliminary design scheme and in-situ conditions and is used to analyze the variation in frozen curtain properties with various active freezing times during excavation.The results show that excavation has a weakening effect on both sides of the frozen wall,with a greater effect on the inner side,and a positive temperature appears in the local area inside the jacked pipe.The concrete fill in the jacked pipe obviously improves the freezing efficiency,and the tunnel excavation after 60 days of active freezing in the interval filling mode can ensure that the frozen soil thickness at the thinnest segment exceeds 2 m,i.e.,the design requirement.In practice,the active freezing time can be extended appropriately to reduce the influence of river water flow above the tunnel.The study serves as a technical reference for the design and implementation of similar projects.展开更多
In recent years,there is a scenario in urban tunnel constructions to build super-large-span tunnels for traffic diversion and route optimization purposes.However,the increased size makes tunnel support more difficult....In recent years,there is a scenario in urban tunnel constructions to build super-large-span tunnels for traffic diversion and route optimization purposes.However,the increased size makes tunnel support more difficult.Unfortunately,there are few studies on the failure and support mechanism of the surrounding rocks in the excavation of supported tunnel,while most model tests of super-large-span tunnels focus on the failure characteristics of surrounding rocks in tunnel excavation without supports.Based on excavation compensation method(ECM),model tests of a super-large-span tunnel excavation by different anchor cable support methods in the initial support stage were carried out.The results indicate that during excavation of super-large-span tunnel,the stress and displacement of the shallow surrounding rocks decrease,following a step-shape pattern,and the tunnel failure is mainly concentrated on the vault and spandrel areas.Compared with conventional anchor cable supports,the NPR(negative Poisson’s ratio)anchor cable support is more suitable for the initial support stage of the super-large-span tunnels.The tunnel support theory,model test materials,methods,and the results obtained in this study could provide references for study of similar super-large-span tunnels。展开更多
By determining the distribution and extent of geological structures surrounding the Mingyan Tunnel,Xicheng Town,Helong City,Jilin Province,we can evaluate the stability of the rock mass and assess potential hazards du...By determining the distribution and extent of geological structures surrounding the Mingyan Tunnel,Xicheng Town,Helong City,Jilin Province,we can evaluate the stability of the rock mass and assess potential hazards during tunnel construction.We use the high-density resistivity method to analyze the subsurface structure of the study area.Conductive anomalies are likely to represent joint and fissure systems within strongly weathered host rocks,and the bedrock surrounding the tunnel is relatively stable and does not contain well-developed faults.High-density resistivity analysis can provide valuable information in the context of tunnel engineering and safety.展开更多
This study is focused on the effect of vibration induced by moving trains in tunnels on the surrounding ground and structures.A three-dimensional finite element model is established for a one-track railway tunnel and ...This study is focused on the effect of vibration induced by moving trains in tunnels on the surrounding ground and structures.A three-dimensional finite element model is established for a one-track railway tunnel and an adjacent twelve-storey building frame by using commercial software Midas GTS-NX(2019)and Midas Gen.This study considered the moving load effect of a complete train,which varies with space as well as with time.The effect of factors such as train speed,overburden pressure on the tunnel and variation in soil properties are studied in the time domain.As a result,the variations in horizontal and vertical acceleration for two different sites,i.e.,the free ground surface(without structure)and the area containing the structure,are compared.Also,the displacement pattern of the raft foundation is plotted for different train velocities.At lower speeds,the heaving phenomenon is negligible,but as the speed increases,both the heaving and differential settlement increase in the foundation.This study demonstrates that the effect of moving train vibrations should be considered in the design of new nearby structures and proper ground improvement should be considered for existing structures.展开更多
Seismic isolation is an effective strategy to mitigate the risk of seismic damage in tunnels.However,the impact of surface-reflected seismic waves on the effectiveness of tunnel isolation layers remains under explored...Seismic isolation is an effective strategy to mitigate the risk of seismic damage in tunnels.However,the impact of surface-reflected seismic waves on the effectiveness of tunnel isolation layers remains under explored.In this study,we employ the wave function expansion method to provide analytical solutions for the dynamic responses of linings in an elastic half-space and an infinite elastic space.By comparing the results of the two models,we investigate the seismic isolation effect of tunnel isolation layers induced by reflected seismic waves.Our findings reveal significant differences in the dynamic responses of the lining in the elastic half-space and the infinitely elastic space.Specifically,the dynamic stress concentration factor(DSCF)of the lining in the elastic half-space exhibits periodic fluctuations,influenced by the incident wave frequency and tunnel depth,while the DSCF in the infinitely elastic space remain stable.Overall,the seismic isolation application of the tunnel isolation layer is found to be less affected by surface-reflected seismic waves.Our results provide valuable insights for the design and assessment of the seismic isolation effect of tunnel isolation layers.展开更多
基金the Postgraduate Research and Practice Innovation Program of Jiangsu Province(Grant No.KYCX22_0621)the National Natural Science Foundation of China(Grant No.52209130)Jiangsu Funding Program for Excellent Postdoctoral Talent.
文摘Tunnel construction is susceptible to accidents such as loosening, deformation, collapse, and water inrush, especiallyunder complex geological conditions like dense fault areas. These accidents can cause instability and damageto the tunnel. As a result, it is essential to conduct research on tunnel construction and grouting reinforcementtechnology in fault fracture zones to address these issues and ensure the safety of tunnel excavation projects. Thisstudy utilized the Xianglushan cross-fault tunnel to conduct a comprehensive analysis on the construction, support,and reinforcement of a tunnel crossing a fault fracture zone using the three-dimensional finite element numericalmethod. The study yielded the following research conclusions: The excavation conditions of the cross-fault tunnelarray were analyzed to determine the optimal construction method for excavation while controlling deformationand stress in the surrounding rock. The middle partition method (CD method) was found to be the most suitable.Additionally, the effects of advanced reinforcement grouting on the cross-fault fracture zone tunnel were studied,and the optimal combination of grouting reinforcement range (140°) and grouting thickness (1m) was determined.The stress and deformation data obtained fromon-site monitoring of the surrounding rock was slightly lower thanthe numerical simulation results. However, the change trend of both sets of data was found to be consistent. Theseresearch findings provide technical analysis and data support for the construction and design of cross-fault tunnels.
基金Projects(42377148,51674265)supported by the National Natural Science Foundation of ChinaProject(2018YFC0603705)supported by the National Key Research and Development Program of China。
文摘Engineering shallow,large-span rock tunnels challenges deformation control and escalates construction costs.This study investigates the excavation compensation method(ECM)and its associated technologies to address these issues.Utilizing five key technologies,the ECM effectively modulates radial stress post-excavation,redistributes stress in the surrounding rock,and eliminates tensile stress at the excavation face.Pre-tensioning measures further enhance the rock’s residual strength,establishing a new stability equilibrium.Field tests corroborate the method’s effectiveness,demonstrating a crown settlement reduction of 3–8 mm,a nearly 50%decrease compared to conventional construction approaches.Additionally,material consumption and construction duration were reduced by approximately 30%–35%and 1.75 months per 100 m,respectively.Thus,the ECM represents a significant innovation in enhancing the stability and construction efficiency of large-span rock tunnels,marking a novel contribution to the engineering field.
基金Project(52178402)supported by the National Natural Science Foundation of ChinaProject(2021-Key-09)supported by the Science and Technology Research and Development Program Project of China Railway Group LimitedProject(2021zzts0216)supported by the Innovation-Driven Project of Central South University,China。
文摘Due to the long-term plate tectonic movements in southwestern China,the in-situ stress field in deep formations is complex.When passing through deep soft-rock mass under non-hydrostatic high in-situ stress field,tunnels will suffer serious asymmetric deformation.There is no available support design method for tunnels under such a situation in existing studies to clarify the support time and support stiffness.This study first analyzed the mechanical behavior of tunnels in non-hydrostatic in-situ stress field and derived the theoretical equations of the ground squeezing curve(GSC)and ground loosening curve(GLC).Then,based on the convergence confinement theory,the support design method of deep soft-rock tunnels under non-hydrostatic high in-situ stress field was established considering both squeezing and loosening pressures.In addition,this method can provide the clear support time and support stiffness of the second layer of initial support.The proposed design method was applied to the Wanhe tunnel of the China-Laos railway in China.Monitoring data indicated that the optimal support scheme had a good effect on controlling the tunnel deformation in non-hydrostatic high in-situ stress field.Field applications showed that the secondary lining could be constructed properly.
基金National Natural Science Foundation of China(41630640)National Science Foundation of Innovation Research Group(41521002)+1 种基金National Natural Science Foundation of China(41790445)Construction S&T Project of Department of Transportation of Sichuan Province(Grant No.2020A01).
文摘The stratum lithology and geological structure of the highway tunnel in the mountainous areas of western China are complex,and the engineering geological conditions are complicated.When the highway tunnel passes through different lithological strata,its structural design and construction technology are completely diff erent.Therefore,in order to support the tunnel design and construction,the tunnel survey Among them,the identifi cation of the contact boundary between magmatic rock and metamorphic rock and the grade of surrounding rock is very important.Through magnetotelluric survey of the Mupi tunnel of Jiuzhaigou-Mianyang highway on G8513 line,2D forward numerical simulation,1D,2D,3D inversion,and engineering geological analysis,it is revealed that the electrical characteristics of each layer,focusing on the identifi cation of the contact boundary between magmatic rock and metamorphic rock.This study provides the electrical characteristics of the magmatic rock and metamorphic rock contact boundary of the Mupi Tunnel.It is speculated that the boundary is revealed by the tunnel construction excavation,which verifies the correctness of the geophysical inversion model and provides a more detailed design basis for the tunnel design.I believe that taking the Mupi Tunnel survey as an example,through this research,it can provide detailed geophysical evidence for highway tunnels to distinguish between magmatic rock and metamorphic rock.
基金The authors would like to acknowledge the financial support from the Key Special Project of the National Natural Science Foundation of China(No.41941018)the Special Fund of Yueqi Scholars(No.800015Z1207).
文摘In recent years,the mine tunneling method and the new Austrian tunneling method have been considered the main theories of tunneling approaches in China.It is difficult for the traditional technique to overcome the large deformation problems imposed by complex geological conditions of mountain soft rock tunneling.Hence,the compensation excavation method has been proposed to solve this issue under the consideration that all damage in tunneling originates from the excavation.It uses supportive strategies to counteract the excavation effects successfully.This paper provides an overview of the fundamental ideas of the compensation excavation method,methodologies,and field applications.The scientific validity and feasibility of the compensation excavation method were investigated through the practical engineering study of the Muzhailing and Changning tunnels.
基金funded by Japan Society for the Promotion of Science(JSPS)Grant-in-Aid for Scientific Research(Grant No.17H03506)JSPS-NSFC Bilateral Joint Research Project,Japan。
文摘Accurate seismic assessment and proper aseismic design of underground structures require a comprehensive understanding of seismic performance and response of underground structures under earthquake force.In order to understand the seismic behavior of tunnels during an earthquake,a wide collection of case histories has been reviewed from the available literature with respect to damage classification,to discuss the possible causes of damage,such as earthquake parameters,structural form and geological conditions.In addition,a case of Tawarayama tunnel subjected to the 2016 Kumamoto earthquake is studied.Discussion on the possible influence factors aims at improving the performancebased aseismic design of tunnels.Finally,restoration design criterion and methods are presented taking Tawarayama tunnel as an example.
文摘Rockbursting in deep tunnelling is a complex phenomenon posing significant challenges both at the design and construction stages of an underground excavation within hard rock masses and under high in situ stresses. While local experience, field monitoring, and informed data-rich analysis are some of the tools commonly used to manage the hazards and the associated risks, advanced numerical techniques based on discontinuum modelling have also shown potential in assisting in the assessment of rockbursting. In this study, the hybrid finite-discrete element method(FDEM) is employed to investigate the failure and fracturing processes, and the mechanisms of energy storage and rapid release resulting in bursting, as well as to assess its utility as part of the design process of underground excavations.Following the calibration of the numerical model to simulate a deep excavation in a hard, massive rock mass, discrete fracture network(DFN) geometries are integrated into the model in order to examine the impact of rock structure on rockbursting under high in situ stresses. The obtained analysis results not only highlight the importance of explicitly simulating pre-existing joints within the model, as they affect the mobilised failure mechanisms and the intensity of strain bursting phenomena, but also show how the employed joint network geometry, the field stress conditions, and their interaction influence the extent and depth of the excavation induced damage. Furthermore, a rigorous analysis of the mass and velocity of the ejected rock blocks and comparison of the obtained data with well-established semi-empirical approaches demonstrate the potential of the method to provide realistic estimates of the kinetic energy released during bursting for determining the energy support demand.
文摘Recent developments in tunneling have stimulated design practitioners to more effectively utilize the underground spaces.However,tunneling at shallow depth in soft grounds gives rise to concerns associated with tunnel instability.Umbrella arch method(UAM),as a pre-reinforcement approach of tunnels in complex geological conditions,is widely used to maintain the tunnel stability.Quantitative assessment of the impacts of the entire approach and forepoling pipe features on tunnel stability remains challenging due to the complex nature of the UAM application.This study aimed to assess the effect of pipe design parameters on reinforcing the tunnels excavated in soft grounds.This practical investigation considered the actual field conditions attributed to the tunneling procedure and UAM deployment.Then,the tunneling process was modeled and the tunnel excavation-induced settlements were calculated.The post-processed results confirmed that deploying the UAM substantially reduced the tunnel crown and ground surface settlements by 76%and 42%,respectively.Investigation of various design parameters of pipes underscored the significance of incorporating the optimum value for each individual parameter into design schemes to more effectively control the settlements.Additionally,contrasting the settlement reduction rates(SRRs)for pipe design variables showed that the tunnel stability is more sensitive to the changes in the values of diameter and length,compared to values of the installation angle and center-tocenter distance of the pipes.
基金Project(2021JLM-49) supported by Natural Science Basic Research Program of Shaanxi-Joint Fund of Hanjiang to Weihe River Valley Water Diversion Project,ChinaProject(42077248) supported by the National Natural Science Foundation of China
文摘For deep tunnel projects,selecting an appropriate initial support distance is critical to improving the self-supporting capacity of surrounding rock.In this work,an intuitive method for determining the tunnel’s initial support distance was proposed.First,based on the convergence-confinement method,a three-dimensional analytical model was constructed by combining an analytical solution of a non-circular tunnel with the Tecplot software.Then,according to the integral failure criteria of rock,the failure tendency coefficients of hard surrounding rock were computed and the spatial distribution plots of that were constructed.On this basis,the tunnel’s key failure positions were identified,and the relationship between the failure tendency coefficient at key failure positions and their distances from the working face was established.Finally,the distance from the working face that corresponds to the critical failure tendency coefficient was taken as the optimal support distance.A practical project was used as an example,and a reasonable initial support distance was successfully determined by applying the developed method.Moreover,it is found that the stability of hard surrounding rock decreases rapidly within the range of 1.0D(D is the tunnel diameter)from the working face,and tends to be stable outside the range of 1.0D.
基金Beijing Science and Technology Planning Project(No.D0604003040921)
文摘Constructing a metro station by enlarging shield tunnels combined with a mining/cut-and-cover method provides a new method to solve the contradictions of construction time limits of shield tunnels and stations. As a new-style construction method, there are several specific risks involved in the construction process. Based on the test section of Sanyuanqiao station on Beijing metro line 10, and combined with the existing methods of risk identification at present, including a review of world-wide operational experience of similar projects, the study of generic guidance on hazards associated with the type of work being undertaken, and discussions with qualified and experienced staff from the project team, etc., the specific risks during the construction process of the metro station constructed by enlarging shield tunnels combined with the cut-and-cover method are identified. The results show that the specific risks mainly come from three construction processes which include constructing upper enclosure structures, excavating the soil between shield tunnels and demolishing shield segments. Then relevant risk mitigation measures are put forward. The results can provide references for scheme improvement and a comprehensive risk assessment of the new-style construction method.
基金General Directorate of Highways(KGM)for their supports。
文摘Since the development of the new Austrian tunnelling method(NATM)in the 1960s,this technique has been applied successfully in many tunnels.However,opinions of NATM principles emerged till 2000,i.e.NATM is not a tunnelling method,but an approach covering all general principles of tunnelling.To investigate the general principles of the NATM,this study focused on tunnelling practises in the Bolu tunnel,and evaluated the conditions under which the NATM practises could be effective.The Bolu tunnel project was designed following the NATM principles.It is evident that practises adopted in this tunnel are important with respect to the NATM.In addition,it shows that the solutions to the problems encountered in this tunnel are consistent with the NATM principles.Finally,the study determines the ground types of the NATM principles and proposes associated updates.
基金Supported by the National Basic Research Program of China(2007CB714006)the National Natural Science Foundation of China(90815023)
文摘An estimation approach using least squares method was presented for identificationof model parameters of pressure control in shield tunneling.The state equation ofthe pressure control system for shield tunneling was analytically derived based on themass equilibrium principle that the entry mass of the pressure chamber from cutting headwas equal to excluding mass from the screw conveyor.The randomly observed noise wasnumerically simulated and mixed to simulated observation values of system responses.The numerical simulation shows that the state equation of the pressure control system forshield tunneling is reasonable and the proposed estimation approach is effective even ifthe random observation noise exists.The robustness of the controlling procedure is validatedby numerical simulation results.
基金Projects(51804113,52074116)supported by the National Natural Science Foundation of ChinaProject(2020M682563)supported by the China Postdoctoral Science Foundation+1 种基金Project(19C0743)supported by the Scientific Research Foundation of Hunan Provincial Education Department,ChinaProject(E52076)supported by the Science Foundation of Hunan University of Science and Technology,China。
文摘In order to investigate the stability problem of shield tunnel faces subjected to seismic loading,the pseudodynamic method(P-DM)was employed to analyze the seismic effect on the face.Two kinds of failure mechanisms of active collapse and passive extrusion were considered,and a seismic reliability model of shield tunnel faces under multifailure mode was established.The limit analysis method and the response surface method(RSM)were used together to solve the reliability of shield tunnel faces subjected to seismic action.Comparing with existing results,the results of this work are effective.The effects of seismic load and rock mass strength on the collapse pressure,extrusion pressure and reliability index were discussed,and reasonable ranges of support pressure of shield tunnel faces under seismic action were presented.This method can provide a new idea for solving the shield thrust parameter under the seismic loading.
基金National Natural Science Foundation of China under Grant No.51478247。
文摘For the longitudinal seismic response analysis of a tunnel structure under asynchronous earthquake excitations,a longitudinal integral response deformation method classified as a practical approach is proposed in this paper.The determinations of the structural critical moments when maximal deformations and internal forces in the longitudinal direction occur are deduced as well.When applying the proposed method,the static analysis of the free-field computation model subjected to the least favorable free-field deformation at the tunnel buried depth is performed first to calculate the equivalent input seismic loads.Then,the equivalent input seismic loads are imposed on the integral tunnel-foundation computation model to conduct the static calculation.Afterwards,the critical longitudinal seismic responses of the tunnel are obtained.The applicability of the new method is verified by comparing the seismic responses of a shield tunnel structure in Beijing,determined by the proposed procedure and by a dynamic time-history analysis under a series of obliquely incident out-of-plane and in-plane waves.The results show that the proposed method has a clear concept with high accuracy and simple progress.Meanwhile,this method provides a feasible way to determine the critical moments of the longitudinal seismic responses of a tunnel structure.Therefore,the proposed method can be effectively applied to analyze the seismic response of a long-line underground structure subjected to non-uniform excitations.
基金supported by the Saint Petersburg Mining University
文摘Tunnels are now an integral part of the infrastructure in major cities around the world. For many reasons, these tunnels have horseshoe-shaped cross-sections with round top and flat bottom. This paper presents some improvements to the use of the Hyperstatic Reaction Method-HRM for analysing tunnels with horseshoe-shaped cross-sections when these tunnels operate under the influence of earthquakes, particularly in cases when the tunnel lining is a continuous lining. The analysis used parameters of a tunnel from the Hanoi metro system, as well as parameters of the strongest earthquake that may occur in the central Hanoi area in the improved HRM and 2 D numerical methods using the ABAQUS software. On the basis of the results obtained, the paper gives conclusions about the HRM methodology when it is used to calculate tunnels that have horseshoe cross-sections operating under the influence of earthquakes.
基金This research was supported by the National Natural Science Foundation of China(No.52108386)。
文摘The Freeze-Sealing Pipe-Roof(FSPR)method,which has been applied for the first time in the Gongbei Tunnel of the Hong Kong-Zhuhai-Macao Bridge,is a new approach of tunnel pre-support that allows flexible adjustment of freeze tube arrangement and can be adapted to different environmental conditions.When the FSPR method is used to construct shallow burial submerged tunnels,the frozen wall to hold back groundwater during excavation will be weakened by air and water flows inside and outside the tunnel,and its waterproof performance needs to be further investigated.In this paper,a two-dimensional numerical model of the temperature field considering excavation and moving water boundary is established based on the preliminary design scheme and in-situ conditions and is used to analyze the variation in frozen curtain properties with various active freezing times during excavation.The results show that excavation has a weakening effect on both sides of the frozen wall,with a greater effect on the inner side,and a positive temperature appears in the local area inside the jacked pipe.The concrete fill in the jacked pipe obviously improves the freezing efficiency,and the tunnel excavation after 60 days of active freezing in the interval filling mode can ensure that the frozen soil thickness at the thinnest segment exceeds 2 m,i.e.,the design requirement.In practice,the active freezing time can be extended appropriately to reduce the influence of river water flow above the tunnel.The study serves as a technical reference for the design and implementation of similar projects.
基金supported by the Innovation Fund Research Project of State Key Laboratory for Geomechanics and Deep Underground Engineering,China University of Mining and Technology(Grant No.SKLGDUEK202201)the Foundation for the Opening of State Key Laboratory for Geomechanics and Deep Underground Engineering,China University of Mining and Technology(Grant No.SKLGDUEK2129)the Open Research Fund of State Key Laboratory of Geomechanics and Geotechnical Engineering,Institute of Rock and Soil Mechanics,Chinese Academy of Sciences(Grant No.Z020007)。
文摘In recent years,there is a scenario in urban tunnel constructions to build super-large-span tunnels for traffic diversion and route optimization purposes.However,the increased size makes tunnel support more difficult.Unfortunately,there are few studies on the failure and support mechanism of the surrounding rocks in the excavation of supported tunnel,while most model tests of super-large-span tunnels focus on the failure characteristics of surrounding rocks in tunnel excavation without supports.Based on excavation compensation method(ECM),model tests of a super-large-span tunnel excavation by different anchor cable support methods in the initial support stage were carried out.The results indicate that during excavation of super-large-span tunnel,the stress and displacement of the shallow surrounding rocks decrease,following a step-shape pattern,and the tunnel failure is mainly concentrated on the vault and spandrel areas.Compared with conventional anchor cable supports,the NPR(negative Poisson’s ratio)anchor cable support is more suitable for the initial support stage of the super-large-span tunnels.The tunnel support theory,model test materials,methods,and the results obtained in this study could provide references for study of similar super-large-span tunnels。
基金Supported by The National Natural Science Foundation of China(41504076)Jilin Science and Technological Development Program(20180101093JC)。
文摘By determining the distribution and extent of geological structures surrounding the Mingyan Tunnel,Xicheng Town,Helong City,Jilin Province,we can evaluate the stability of the rock mass and assess potential hazards during tunnel construction.We use the high-density resistivity method to analyze the subsurface structure of the study area.Conductive anomalies are likely to represent joint and fissure systems within strongly weathered host rocks,and the bedrock surrounding the tunnel is relatively stable and does not contain well-developed faults.High-density resistivity analysis can provide valuable information in the context of tunnel engineering and safety.
文摘This study is focused on the effect of vibration induced by moving trains in tunnels on the surrounding ground and structures.A three-dimensional finite element model is established for a one-track railway tunnel and an adjacent twelve-storey building frame by using commercial software Midas GTS-NX(2019)and Midas Gen.This study considered the moving load effect of a complete train,which varies with space as well as with time.The effect of factors such as train speed,overburden pressure on the tunnel and variation in soil properties are studied in the time domain.As a result,the variations in horizontal and vertical acceleration for two different sites,i.e.,the free ground surface(without structure)and the area containing the structure,are compared.Also,the displacement pattern of the raft foundation is plotted for different train velocities.At lower speeds,the heaving phenomenon is negligible,but as the speed increases,both the heaving and differential settlement increase in the foundation.This study demonstrates that the effect of moving train vibrations should be considered in the design of new nearby structures and proper ground improvement should be considered for existing structures.
基金supported by the National Natural Science Foundation of China[grant number 51991393]support from the Guangdong Provincial Key Laboratory of Earthquake Engineering and Applied Technology and Key Laboratory of Earthquake Resistance,Earthquake Mitigation,and Structural Safety funded by the Ministry of Education。
文摘Seismic isolation is an effective strategy to mitigate the risk of seismic damage in tunnels.However,the impact of surface-reflected seismic waves on the effectiveness of tunnel isolation layers remains under explored.In this study,we employ the wave function expansion method to provide analytical solutions for the dynamic responses of linings in an elastic half-space and an infinite elastic space.By comparing the results of the two models,we investigate the seismic isolation effect of tunnel isolation layers induced by reflected seismic waves.Our findings reveal significant differences in the dynamic responses of the lining in the elastic half-space and the infinitely elastic space.Specifically,the dynamic stress concentration factor(DSCF)of the lining in the elastic half-space exhibits periodic fluctuations,influenced by the incident wave frequency and tunnel depth,while the DSCF in the infinitely elastic space remain stable.Overall,the seismic isolation application of the tunnel isolation layer is found to be less affected by surface-reflected seismic waves.Our results provide valuable insights for the design and assessment of the seismic isolation effect of tunnel isolation layers.