期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Failure mechanism and control technology of water-immersed roadway in high-stress and soft rock in a deep mine 被引量:12
1
作者 Yang Renshu Li Yongliang +3 位作者 Guo Dongming Yao Lan Yang Tongmao Li Taotao 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2017年第2期245-252,共8页
Aiming at soft rock ground support issues under conditions of high stress and long-term water immersion, the ground failure mechanism is revealed by taking the deep-water sumps of Jiulong Mine as the engineering backg... Aiming at soft rock ground support issues under conditions of high stress and long-term water immersion, the ground failure mechanism is revealed by taking the deep-water sumps of Jiulong Mine as the engineering background and employing field investigation, tests of rock structure, mechanical properties and mineral composition. The main factors leading to the surrounding rock failure include the high and complex stress state of the water sumps, high-clay content and water-weakened rock, and the unreasonable support design. In this paper, the broken and fractured rock mass near roadway opening is considered as ground small-structure, and deep stable rock mass as ground large-structure. A support technology focusing on cutting off the water, strengthening the small structure of the rock and transferring the large structure of the rock is proposed. The proposed support technology of interconnecting the large and small structures, based on high-strength bolts, high-stiffness shotcrete layer plugging water,strengthening the small structure with deep-hole grouting and shallow-hole grouting, highpretensioned cables tensioned twice to make the large and small structures bearing the pressure evenly,channel-steel and high-pretensioned cables are used to control floor heave. The numerical simulation and field test show that this support system can control the rock deformation of the water sumps and provide technical support to similar roadway support designs. 展开更多
关键词 High stress and soft rock Water immersion Failure mechanism Large and small structures Rework control
在线阅读 下载PDF
Dynamic caustics test of blast load impact on neighboring different cross-section roadways 被引量:6
2
作者 Guo Dongming Zhou Baowei +2 位作者 Liu Kang Yang Renshu Yan Pengyang 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2016年第5期803-808,共6页
Using digital laser dynamic caustics experimental system and conducting simulation experiment researched the influence rule of blasting excavation of a new roadway on neighboring existed different cross-section roadwa... Using digital laser dynamic caustics experimental system and conducting simulation experiment researched the influence rule of blasting excavation of a new roadway on neighboring existed different cross-section roadways. The experimental results show that the influence of blast load on adjacent roadway has a good relationship with the cross-section of roadway. The expansion distance of precrack existed in circular, arch-wall, rectangular roadway is respectively 1.76, 1.61 and 0 cm under blast load.At the same time, the direct-blast side of rectangular roadway has more obvious damage compared with circular and arch-wall roadway. It explains that plane reflects more stress wave than arc, so that it exerts more tensile failure in the direct-blast side, which leads to less stress wave diffracting to the precrack in the back-blast side. When the precrack extends, higher value dynamic stress intensity factor in circular roadway works longer than that of arch-wall roadway. Indirectly, it explains that plane's weakening function on stress wave is significantly stronger than arc. Stress wave brings about self-evident influence on the upper and bottom endpoints of the rectangular roadway, and it respectively extends 1.03, 2.06 cm along the line link direction of the center of the blasthole and the upper and bottom endpoints on the right wall. 展开更多
关键词 Dynamic caustics Blast load Different cross-section roadways Precrack Dynamic stress intensity factor
在线阅读 下载PDF
Mechanical performance study of the retractable pier column after stiffening 被引量:1
3
作者 Yi Zhang Xiaoye Wang +3 位作者 Liming Zhao Jie Liu Nana Wang Yingying Ding 《International Journal of Coal Science & Technology》 EI CAS 2020年第4期725-739,共15页
To solve the problem that the overlapping parts of a retractable pier column are prone to damage,this paper proposed the reinforcing measure of setting a stiffener ring at the bottom of the steel pipe.To study how the... To solve the problem that the overlapping parts of a retractable pier column are prone to damage,this paper proposed the reinforcing measure of setting a stiffener ring at the bottom of the steel pipe.To study how the stiffener-ring parameters influence the mechanical properties of the pier column.12 scale model specimens(including nine specimens with stiffener-ring widths of 40,50,and 60 mm and three unstiffened comparison specimens)were tested under axial compression.Based on the test results,the specimen load-displacement,load-deflection,and load-strain curves were analyzed,and a finite-element model of a pier column under axial compression was established to determine the optimal stiffener size.The results show that setting a stiffener ring enhances the cooperative working ability between the steel pipe and the internal filling material and restrains the lateral deformation of the pier column,thereby improving the ultimate bearing capacity and overall stability of the pier column.The ultimate bearing capacity of the pier column is related to the width and thickness of the stiffener ring.The optimal size of the stiffener ring of the model pier column is 70 mm in width and 4 mm in thickness.The present research results provide a reference for designing compressible pier columns and column stiffening in mines and have important practical significance. 展开更多
关键词 Retractable pier column Stiffening reinforcing Axial compression test Ultimate bearing capacity Finiteelement analysis
在线阅读 下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部